Author Topic: I-30 Canyon Project(Dallas)  (Read 2691 times)

Plutonic Panda

  • *
  • Offline Offline

  • Posts: 2299
  • Location: Los Angeles/OKC
  • Last Login: December 07, 2021, 06:42:05 PM
I-30 Canyon Project(Dallas)
« on: April 23, 2021, 07:40:45 PM »

I feel like this project is large enough to warrant its own thread. I-30 will be widened, reconstructed, and realigned in some areas. This project seems somewhat similar to Denverís I-70 project. There will be potential for park caps in some areas though that wonít be initially constructed.

Hereís a PDF report: https://ftp.txdot.gov/pub/txdot/get-involved/dal/i-30-canyon/102919-i-30-canyon-pm-powerpoint-presentation.pdf

Some recent news regarding funding from Bidenís infrastructure funds(the program that replaced BUILD): https://www.dmagazine.com/frontburner/2021/04/txdot-hopes-bidens-transit-priorities-are-good-news-for-its-i-30-canyon-project/
Logged

Plutonic Panda

  • *
  • Offline Offline

  • Posts: 2299
  • Location: Los Angeles/OKC
  • Last Login: December 07, 2021, 06:42:05 PM
Re: I-30 Canyon Project(Dallas)
« Reply #1 on: April 23, 2021, 07:42:23 PM »

Logged

MaxConcrete

  • *
  • Online Online

  • Posts: 805
  • Location: Houston, TX
  • Last Login: Today at 02:22:53 PM
Re: I-30 Canyon Project(Dallas)
« Reply #2 on: April 23, 2021, 07:59:17 PM »

There was a public meeting earlier this year for the environmental clearance of the downtown canyon project. Link below includes schematics

http://www.keepitmovingdallas.com/public-hearings/2021/notice-of-availability-environmental-clearance-approved-schematic-available-pub

The link below says "The project has an anticipated letting date in February 2024" which unfortunately is still three years away. Most TxDOT projects have been delayed due to Covid-related funding shortfalls.
https://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/dallas/012921.html

There appears to be no organized opposition to the downtown canyon work. I'm thinking the bidding date could be advanced to be sooner if TxDOT's financial situation improves.

However, all work to the east has opposition and probably won't happen anytime soon, and by that I mean not in the 2020s. A new tactic used by anti-freeway interests in Houston and Dallas is to block right-of-way acquisition, which makes expansion impossible or much more expensive. The City of Dallas is trying to prevent any right-of-way acquisition on IH-30 east project.

MaxConcrete

  • *
  • Online Online

  • Posts: 805
  • Location: Houston, TX
  • Last Login: Today at 02:22:53 PM
Re: I-30 Canyon Project(Dallas)
« Reply #3 on: May 25, 2021, 12:04:30 AM »

However, all work to the east has opposition and probably won't happen anytime soon, and by that I mean not in the 2020s. A new tactic used by anti-freeway interests in Houston and Dallas is to block right-of-way acquisition, which makes expansion impossible or much more expensive. The City of Dallas is trying to prevent any right-of-way acquisition on IH-30 east project.

My comment in April may be wrong. TxDOT has scheduled a public meeting for the first section of IH-30 east of IH-45.
https://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/dallas/060821.html

Quote
The proposed improvements would include ten general purpose lanes (five in each direction), two reversible managed lanes, discontinuous two to three lane frontage roads in each direction, and reconstruction of ramps and bridge structures. The proposed I-30 main lanes and managed lanes would be depressed from I-345/I-45 to Dolphin Road. Accommodations for bicycle and pedestrian travel along the project corridor are a component of project development.

The proposed Right of Way typically ranges from 308 to 505 feet in width. The proposed improvements would require additional ROW.

Observations
  • The planned design remains 5-2M-5. (The freeway is currently 4-1M-4) So it appears TxDOT has worked out differences with the City of Dallas.
  • Consistent with longstanding plans, the elevated lanes will be sunk below ground level.
  • I think the frontage roads were originally planned to be continuous, but are now listed as discontinuous
  • While the meeting announcement says additional ROW will be required, I'm expecting it to be minimal. Curtailing frontage roads will probably be the main way to reduce ROW requirements.

bwana39

  • *
  • Offline Offline

  • Posts: 977
  • Location: Near Texarkana TX
  • Last Login: December 07, 2021, 10:42:56 PM
Re: I-30 Canyon Project(Dallas)
« Reply #4 on: May 25, 2021, 08:09:29 AM »

There were originally partial service roads in the canyon, they were mostly subsumed as exit lanes for the Horseshoe project. The service roads never had a lot of usage before they were repurposed.

There were a handful of exits and entrances, but they were awkward at best. As a quick point to make, Most of the roadway is 10 or more feet below ground level residing in a man-made canyon....therefore the name.

My belief is the convention center does as much or more to interrupt downtown to the south than I-30.
« Last Edit: May 25, 2021, 08:21:31 AM by bwana39 »
Logged
Let's build what we need as economically as possible.

MaxConcrete

  • *
  • Online Online

  • Posts: 805
  • Location: Houston, TX
  • Last Login: Today at 02:22:53 PM
Re: I-30 Canyon Project(Dallas)
« Reply #5 on: June 08, 2021, 07:26:27 PM »

The public meeting materials and schematics for the east corridor (east of IH-45) are posted online
http://www.keepitmovingdallas.com/I30EC

The good news is that the proposed design does not appear to be compromised from earlier designs. (I don't have a schematic of the preliminary design so I can't say for certain.)  It remains a very ambitious design.

There are numerous property acquisitions and displacements required, but virtually all of them are vacant lots, parking lots or lower-tier commercial properties. Just like the Southern Gateway (IH-35E south) and LBJ east projects currently under construction, the right-of-way along much of the corridor is maxed out with pavement with virtually no space to spare.

Frontage roads are added, but they are not continuous.

The presentation says construction could begin in Fall 2024, which would be an ambitious schedule, dependent on funding and no major opposition or legal challenges.
« Last Edit: June 08, 2021, 08:00:57 PM by MaxConcrete »
Logged

In_Correct

  • *
  • Offline Offline

  • Posts: 569
  • Safety > Danger ... Road Buffets > Road Diets

  • Location: TX
  • Last Login: Today at 04:29:10 AM
Re: I-30 Canyon Project(Dallas)
« Reply #6 on: June 09, 2021, 04:07:53 PM »

But they simply must be continuous.
Logged
Drive Safely. :sombrero: Ride Safely. And Build More Roads, Rails, And Bridges. :coffee: ... Boulevards Wear Faster Than Interstates.

Road Hog

  • *
  • Offline Offline

  • Posts: 1531
  • Location: Collin County, TX
  • Last Login: December 06, 2021, 08:32:10 AM
Re: I-30 Canyon Project(Dallas)
« Reply #7 on: August 28, 2021, 07:22:01 PM »

Woodall was shut down for an accident, so I used the canyon to cut across from I-35E to 75 the other day for the first time.

Holy cow, what a rat's nest of lanes and merges. Fixing that is way, way worth it.
Logged

bwana39

  • *
  • Offline Offline

  • Posts: 977
  • Location: Near Texarkana TX
  • Last Login: December 07, 2021, 10:42:56 PM
Re: I-30 Canyon Project(Dallas)
« Reply #8 on: August 28, 2021, 11:30:44 PM »

Woodall was shut down for an accident, so I used the canyon to cut across from I-35E to 75 the other day for the first time.

Holy cow, what a rat's nest of lanes and merges. Fixing that is way, way worth it.

I am not sure that this project will help your particular concern at all. It appears the canyon will become narrower and perhaps deeper.  More of the surface streets above will be through. It is about connecting the area between  I-30 and the Trinity River with downtown. I am not sure it is going to do much to aleviate anything in the realm of freeway traffic
Logged
Let's build what we need as economically as possible.

Plutonic Panda

  • *
  • Offline Offline

  • Posts: 2299
  • Location: Los Angeles/OKC
  • Last Login: December 07, 2021, 06:42:05 PM
Re: I-30 Canyon Project(Dallas)
« Reply #9 on: September 21, 2021, 08:11:39 PM »

It looks like this project or part of it is eligible for financing through the INFRA extra program from 2019 submissions. I wonder if Texas pursued it and maybe thatíll speed it up.
Logged

austrini

  • *
  • Offline Offline

  • Posts: 219
  • Location: Dallas
  • Last Login: November 23, 2021, 04:41:44 PM
Re: I-30 Canyon Project(Dallas)
« Reply #10 on: September 25, 2021, 04:56:36 PM »

It looks like this project or part of it is eligible for financing through the INFRA extra program from 2019 submissions. I wonder if Texas pursued it and maybe thatíll speed it up.

Hey I worked on this (on the maps)! We applied in May of 2021 for 146 million out of 564 million. The original freeway section opened in April of 1966. The city wants it capped, and they're applying for another grant to do that, I think.
Logged
AICP (2012), GISP (2020)

Plutonic Panda

  • *
  • Offline Offline

  • Posts: 2299
  • Location: Los Angeles/OKC
  • Last Login: December 07, 2021, 06:42:05 PM
Re: I-30 Canyon Project(Dallas)
« Reply #11 on: September 25, 2021, 05:12:27 PM »

^^^ hopefully this new infrastructure package passes. I bet getting it capped will be a sure thing with the new funding meant to reconnect communities that were divided by freeway construction.
Logged

Plutonic Panda

  • *
  • Offline Offline

  • Posts: 2299
  • Location: Los Angeles/OKC
  • Last Login: December 07, 2021, 06:42:05 PM
Re: I-30 Canyon Project(Dallas)
« Reply #12 on: September 25, 2021, 05:16:33 PM »