County Road 54 West - Zephyrhills to Wesley Chapel


Collectively SR 54 and CR 54 travel 38.3 miles from U.S. 301 in Zephyrhills to U.S. 19 at Elfers (south of New Port Richey).
09/03/20
5th Avenue leads CR 54 through Zephyrhills West. The succeeding traffic light is with Coats Road south and Dean Dairy Road north.
09/03/20
The CR 54 branch along Eiland Boulevard runs north of Zephyrhills West and combines with CR 579 south from Handcart Road to CR 54.
09/04/17
Continuing from CR 54/579 and Morris Bridge Road, a $42.5 million project widened then-SR 54, 4.5 miles west to a point east of CR 577 (Curley Road). Construction converting the road into a four lane arterial started in November 2017 and was originally anticipated for completion in Summer 2021.1
12/04/17
Meadow Pointe Boulevard is a suburban arterial linking CR 54 with SR 56 and the Meadow Pointe Boulevard development along the Hillsborough County line.
05/05/15
CR 54 shifts northward to the west end of the Zephyrhills Bypass. The two lane, divided boulevard east to Cason Boulevard was built in place of the cancelled Zephyrhills West Bypass Extension.
05/05/15
2017-21 widening of then-SR 54 between CR 579 (Morris Bridge Road) and CR 577 (Curley Road) added a triple left turn at the previously unused roadway for the Zephyrhills West Bypass Extension. Shields erroneously reference Zephyrhills Bypass east as part of CR 54.
10/04/25
CR 54 continues west from Zephyrhills Bypass with six overall lanes to CR 581 (Bruce B. Downs Boulevard).
05/05/15
Land O' Lakes spreads to the west of Wesley Chapel. The community center is roughly located at SR 54 and U.S. 41, 14 miles to the west.
01/20/20
Saddlebrook Way is the lone entrance to the Saddlebrook golf course community south of CR 54.
01/20/20
Reassurance shield posted westbound between Saddlebrook Way and The Villages of Wesley Chapel development.
01/20/20
CR 54 next intersects Pointe Pleasant Boulevard north and Wiregrass Ranch Boulevard south. The arterial south connects with Mansfield Boulevard at SR 56.
05/05/15
A temporary end shield for SR 54 preceded CR 581 (Bruce B. Downs Boulevard) south and CR 54 (Wesley Chapel Boulevard) west. SR 581 was designated to link the disconnected sections of SR 54 via SR 56.
04/26/19
References:
- SR 54 Widening from east of Curley Road to east of Morris Bridge Road - 416561-2-52-01. Florida Department of Transportation (FDOT), District 7 project web page.