State Road 780 West



Fruitville Road (CR 780) west at Coburn Road. An extension of Lakewood Ranch Boulevard ties into this signalized intersection from the north.
09/26/13
SR 780 (Fruitville Road) meets Interstate 75 at a six-ramp parclo interchange. Future work reconfigures this exchange into a DDI.
04/17/22
The begin state maintenance assembly for SR 780 west was previously located ahead of Coburn Road north.
09/26/13
04/17/22
05/18/19
06/17/14
SR 780 (Fruitville Road) enters the city of Sarasota between McIntosh Road and Whispering Oaks Court.
06/17/14
Lockwood Rirdge Road (CR 683) stems north from SR 780 (Fruitville Road) to Keningston Park and North Sarasota.
06/17/14
School Avenue south links SR 780 with its former alignment along Main Street west toward Downtown Sarasota.
06/17/14
Fruitville Road shifts northward through an S-curve from 1st to 3rd Streets leading to the signal with East Avenue.
06/17/14
U.S. 301 (Washington Boulevard) passes through Downtown Sarasota south from SR 780 to conclude at U.S. 41 (Mound Street).
06/17/14

Photo Credits:
- Brent Ivy: 09/26/13, 04/17/22
- ABRoads: 06/17/14, 05/18/19
Connect with:
Page Updated Wednesday October 12, 2022.