Interstate 95 South - Lake Worth Beach to Boca Raton

South
The diamond interchange (Exit 64) joining Interstate 95 with 10th Avenue N overlays the adjacent Tri-Rail line.
10/17/21
10/17/21
Interstate 95 runs along the west side of the Lantana town limits south to Exit 60 for Hypoluxo Road.
10/17/21
10/17/21
Hypoluxo Road connects with Interstate 95 west of San Castle in unincorporated Palm Beach County.
10/17/21
10/17/21
Gateway Boulevard meets I-95 at a diamond interchange (Exit 59) on the north side of Boynton Beach.
10/17/21
10/17/21
Shifting slightly west, Interstate 95 advances 1.25 miles south from Gateway Boulevard to Exit 57 for SR 804 (Boynton Beach Boulevard).
10/17/21
10/17/21
The eastern leg of SR 804 (Ocean Avenue) links U.S. 1 with SR A1A across the Intracoastal Waterway in the town of Ocean Ridge.
10/17/21
10/17/21
The last Boynton Beach exit along Interstate 95 south is the diamond interchange with Woolbright Road (SW 15th Avenue).
10/17/21
10/17/21
Angling southwest into Delray Beach, 3.2 miles separate the entrance ramp from Woolbright Road and Exit 52 to SR 806 (Atlantic Avenue).
10/17/21
10/17/21
Interstate 95 enters the city of Boca Raton south at the diamond interchange (Exit 50) with Congress Avenue.
10/17/21
10/17/21
$148 million in construction for 95 Express Lanes Phase 3B-2 got underway south from Linton Boulevard on November 7, 2019. The project extends 5.831 miles to south of SR 808 (Glades Road).1
10/17/21
10/17/21
Exit 48B links I-95 south with SR 794 (Yamato Road) at a parclo interchange adjacent to directional interchange (Exit 48 A) with FAU Boulevard south at NW 40th Street.
10/17/21
10/17/21
Construction through late 2023 extends the Express Lanes along Interstate 95 northward from SR 808 (Glades Road) / Exit 45 to Linton Boulevard / Exit 51.1
10/17/21
10/17/21
SR 794 lines Yamato Road for 2.78 miles between Military Trail (CR 809) and U.S. 1 (Federal Highway).
10/17/21
10/17/21
Originally Exit 48 was a six-ramp parclo interchange joining I-95 with just SR 794 (Yamato Road).
10/17/21
10/17/21
Construction of the I-95 Express Lanes reconfigures the six-ramp parclo interchange (Exit 45) at SR 808 (Glades Road) into a DDI.
10/17/21
10/17/21
References:
- 95 Express Phase 3B-2 from south of Glades Road to south of Linton Boulevard and SR 808/Glades Road from NW 22nd Way to West University Drive & Glades Road Diverging Diamond Interchange (DDI). Florida Department of Transportation (FDOT), District 4 Road Construction Projects.
- 95 Express Phase 3B-1 from south of SW 10th Street to south of Glades Road. Florida Department of Transportation (FDOT), District 4 Road Construction Projects.
Photo Credits:
- Alex Nitzman: 10/17/21
Page Updated Wednesday September 07, 2022.