Delaware State Route 2 Archive


Confirming marker for SR 2 west of the merge with SR 72. A new assembly posted in 2012 added SR 72 south. 06/26/10

Mast arm signals replaced this set of span wires at SR 2 west / SR 72 (Capitol Trail) south with Cleveland Avenue. 06/30/10

SR 2 west / SR south at the graffiti laden CSX Railroad bridge between Cleveland Avenue and the split with E Main Street. 04/24/04

SR 2/72 reassurance shields previously posted along Library Avenue between SR 273 (E Main Street) east and SR 273 (Delaware Avenue) west. 06/08/12

SR 2/72 (S Chapel Street) split outside Newark at SR 4 (Chestnut Hill Road). SR 72 continues south to Wrangle Hill. 06/08/12

Until Fall 2013, SR 2 joined SR 4 west along Chestnut Hill Road and Christina Parkway to the Bob Carpenter Center and Elkton Road. This was the first set of shields for the overlap. 06/08/12

SR 896 joined SR 2/4 west for a 1.4 mile long overlap along Christina Parkway. Confirming markers for were posed just west of S College Avenue. 04/30/04

A second set of shields were posted for SR 2-4-896 beyond the east entrance to the former Newark Chrysler plant. The plant shut down in 2009 and was later demolished to make way for an expansion of the University of Delaware campus. 04/30/04

Christina Parkway widens to four lanes leading to Elkton Road. SR 2 Business previously ran along Elkton Road northeast to Downtown Newark alongside SR 896 north. 04/30/04
Photos by AARoads
References:
Page Updated Friday January 24, 2025.