KDOT Contract Lettings - Updated Monthly since April 2015.

Started by route56, April 10, 2015, 11:23:31 AM

Previous topic - Next topic

route56

Quote from: mvak36 on July 09, 2025, 03:28:52 PM
Quote from: route56 on May 28, 2025, 10:21:07 PM35-46 KA 5060-01: Replace the Gardner Road bridge over I-35 and reconstruct the interchange. Two-lane exit on the Southbound I-35 off-ramp with Arrow Per Lane signage. Dondlinger & Sons Construction Co. Inc., Wichita, $26,157,993.74

Looks like they had a public meeting for a future (unfunded) phase for this project.
Project site: https://www.ksdot.gov/projects/northeast-kansas-projects/gardner-i-35-u-s-56-interchange-improvements
Meeting materials: https://www.ksdot.gov/home/showpublisheddocument/13323

The I-35 project from the June lettings was for exit 207. The project you are referring to is the next exit to the north, exit 210.
Peace to you, and... don't drive like my brother.

R.P.K.


mvak36

Quote from: route56 on July 19, 2025, 11:00:15 AM
Quote from: mvak36 on July 09, 2025, 03:28:52 PM
Quote from: route56 on May 28, 2025, 10:21:07 PM35-46 KA 5060-01: Replace the Gardner Road bridge over I-35 and reconstruct the interchange. Two-lane exit on the Southbound I-35 off-ramp with Arrow Per Lane signage. Dondlinger & Sons Construction Co. Inc., Wichita, $26,157,993.74

Looks like they had a public meeting for a future (unfunded) phase for this project.
Project site: https://www.ksdot.gov/projects/northeast-kansas-projects/gardner-i-35-u-s-56-interchange-improvements
Meeting materials: https://www.ksdot.gov/home/showpublisheddocument/13323

The I-35 project from the June lettings was for exit 207. The project you are referring to is the next exit to the north, exit 210.

My mistake. I saw Gardner and assumed it was that one.
Counties: Counties visited
Travel Mapping: Summary

kphoger

Quote from: mvak36 on July 21, 2025, 09:50:46 AMMy mistake. I saw Gardner and assumed it was that one.

[John 20:15b]
Supposing him to be the gardener, she ...

He Is Already Here! Let's Go, Flamingo!
Dost thou understand the graveness of the circumstances?
Deut 23:13
Male pronouns, please.

Quote from: PKDIf you can control the meaning of words, you can control the people who must use them.

Sani

Annoyingly, the only information I could find from KDOT regarding the I-35/Gardner Road interchange project is from this hour-long presentation they gave to the city of Gardner in early 2021. https://www.youtube.com/watch?v=i4U68UM3Y48

It shows an "interim" bridge project and an "ultimate" solution for the interchange. The interim bridge would essentially be one of the two bridges needed for an eventual DDI. The original budget from 2021, in FY 2024 dollars, was $17.2 million, so I don't know if the awarded bid at $26.2 million includes additional work or is just that bad of an inflationary increase from the original budget.

route56

August 2025

There are 31 lettings across 28 projects up for bids on August 20.

Federal-Aid:
(unless otherwise noted)

135-59 KA 7282-01: Lighting upgrades at the Northbound and Southbound rest areas on I-135 north of McPherson

24-33 KA 7744-01: 2-inch milling and 2-inch HMA overlay on US 24 from the Sheridan/Graham County Line to the East City Limits of Hill City
84-33 KA 7746-01: 1/2-inch milling and 1.5-inch HMA overlay on the entire length of K-84 [Non-FA]
85-33 KA 7745-01: 1/2-inch milling and 1.5-inch HMA overlay on the entire length of K-85 [Non-FA]

69 C 5285-01: Replace Road BB bridge over the North Fork Solomon River east of Lenora

24-82 KA 7743-01: Surface Recycle and Chip Seal on US 24 from the Graham/Rooks County Line to Stockton

90 C 5298-01: Replace the bridge on County Road 125E over the Saline River in southeast Sheridan County

19 C 5295-01: Replace the bridge on 690th Avenue over a Tributary to Little Walnut Creek

900-8 KA 6474-01: Replace the bridge on East 12th Avenue over the Walnut River in the El Dorado Lake State Park.

54-48 KA 7718-01: 2-inch milling and 2-inch HMA overlay on US 54 from 1 mile west of K-11 to Kingman

61-78 KA 7711-01: 1.5-inch milling and 2-inch HMA overlay on K-61 from Arlington to US 50

50-78 KA 7748-01 1.5-inch Overlay on US 50 from Sego Road to K-61

14-78 KA 7768-01/14-48 KA 7769-01: 1-inch milling and 1.5-inch HMA overlay on K-14 from US 54 to K-96 (the former K-17) [Kingman County segment is non-FA]

29 TE 0513-01: Construct a new path along Commanche Street from 1st Avenue to Avenue P in Dodge City

106 KA 6234-02: ITS upgrades along US 83 in Finney, Scott, Logan, and Thomas Counties

Federal Aid, Local Projects

27 C 5249-01: Major Collector signage upgrade in Ellsworth county north and west of K-156

26 C 5261-01: Signing and pavement marking upgrades on several roads in Ellis County

Non-FA:

106 KA 7579-01: Sidewalk ramp updates in Hope, Summerfield, and Beattie

106 KA 7817-01: Mudjacking at various locations in KDOT District 1

25-55 KA 7760-01: Chip Seal on K-25 from the Wichita/Logan County Line to MP 145.9

24-90 KA 7759-01: Chip Seal on US 24 in Sheridan County

24-90 KA 7765-01: 2-inch mill and 2-inch pavement patching on US 24 in Hoxie

9-106 KA 7756-01: Chip Seal on K-9 from US 183 to US 281 in Phillips and Smith Counties

99-37 KA 6761-01: Replace a drainage culvert at MP 67.6

106 KA 7805-01: Rumble strip milling on US 166 from 0.9 miles west of US 400 to 0.6 miles west of the Missouri State Line, US 69 from K-47 to 680th Avenue, and US 169 from 3 miles north of K-47 to Iola

54-8 KA 7804-01: Crack Sealing on US 54 from El Dorado to the Butler/Greenwood County Line

54-106 KA 7761-01: PCCP patching on US 54 from SE 50th Avenue to the Pratt/Kingman County Line

50-78 KA 6053-02: Reconstruct a short section of US 50 near Brady Lake Road. One lane of traffic to be carried through controlled by signals

251-87 KA 7720-01: 1-inch milling and 1.5-inch HMA overlay on the entire length of K-251.

42-106 KA 7698-01: Crack Sealing on K-42 from US 281 to K-14 in Pratt, Barber, and Kingman Counties
Peace to you, and... don't drive like my brother.

R.P.K.