News:

why is this up in the corner now

Main Menu

KDOT Contract Lettings - Updated Monthly since April 2015.

Started by route56, April 10, 2015, 11:23:31 AM

Previous topic - Next topic

route56

#275
Approved Bids Announced 8/30/2021
Approved Bids Announced 10/6/2021

August 2021

Federal-Aid

89 TE 0494-01: New shared-use path along the north side of SW 10th Street between Wanamaker Road and Robinson Avenue in Topeka

15 C 4966-01: Major collector signage update in Cloud County. One special sign: "U.P. Bridge" CC & I Engineering Inc./DBA Compass Consultants, Perham, Minnesota, $103,863.75.

59 TE 0493-01: New shared-use path along the north side of Northview Avenue from the Meadowlark Trail to Main Street in McPherson. Old US 81 at Northview to be closed during a portion of the project. The Detour via Main Street is marked as K-153 detour; however, the detoured section of old US 81 is not part of K-153. Bryant & Bryant Construction Inc., Halstead, $583,043.64

30 TE 0482-01: Sidewalk update near Keokuk (K-68) and Main (old US 59) in Ottawa Amino Brothers Company Inc., Kansas City, Kansas, $365,992.70.

106 KA 6095-01: Signage upgrade on the state highways in Miami County except for K-68 between US 169 and US 69. Includes replacement of the roundabout signage at K-68 and Old KC Road. Cooper Construction LLC, Emporia, $1,780,830.66.

50-24 KA 6251-01: Mill and HMA overlay between the Ford/Edwards county line and Kinsley. Venture Corporation, Great Bend, $2,382,591.40.

54-88 KA 2385-01: New 4-lane alignment of US 54 just east of Liberal. Removal of the County Road 6 and County Road M intersection, a new frontage road on the southeast side of US 54 connecting County Road M to County Road 7, and a new Weigh Station Koss Construction Co., Topeka, Kansas, $23,319,064.32

Federal-Aid, Local Projects

72 C 4991-01: Replacment of this bridge on 170th Road over Pipe Creek northeast of Minneapolis King Construction Company Inc. & Subsidiaries, Hesston, Kansas, $504,017.00

Non-FA

70-85 KA 6208-01: PCCP patching on I-70 from Niles Road to the Saline/Dickinson County line. Bryant & Bryant, $639,658.50

18-71 KA 6205-01: Chip seal on K-18 in Osborne County
18-84 KA 6206-01: Chip seal on K-18 from the Osborne/Russell County line to US 281
Heft and Sons LLC, Greensburg, $480,177.50

18-82 KA 6276-01: Chip seal on K-18 from Plainville to the Rooks/Osborne County lineHeft and Sons, $505,882.50

36-20 KA 6269-01: Chip seal from Oberlin to Norcatur. Heft and Sons, $631,119.70

160-4 KA 6139-01: Right of way cleanup on US 160 from the Comanche/Barber County line to 3 miles west of Medicine Lodge.

183-106 KA 6168-01 Crack sealing on US 183 from Greensburg to Kinsley. Pavement Pro's LLC, McPherson, $157,188.20

96-51 KA 6203-01: Chip seal on K-96 from Dighton to the Lane/Ness County Line. Heft and Sons, $405,819.70.

54-106 KA 6272-01: Crack sealing on US 54 from the Meade/Clark County line to K-34 in Clark and Ford Counties Pavement Pro's, $78,130.86

94-106 KA 6273-01: Crack sealing on the entire length of K-94 in Clark and Ford Counties. Pavement Pro's, $50,167.70
Peace to you, and... don't drive like my brother.

R.P.K.


route56

Lettings for June and July have been updated with the approved bidders announced via KDOT press release on August 10.

For those of you actually paying attention, would you prefer that I edit the lettings post with the awarded bids, or create a new post with the awards?
Peace to you, and... don't drive like my brother.

R.P.K.

mvak36

Quote from: route56 on August 13, 2021, 02:08:56 PM
Lettings for June and July have been updated with the approved bidders announced via KDOT press release on August 10.

For those of you actually paying attention, would you prefer that I edit the lettings post with the awarded bids, or create a new post with the awards?

I'm fine with the way you do it now.
Counties: Counties visited
Travel Mapping: Summary

J N Winkler

Quote from: route56 on August 13, 2021, 02:08:56 PMFor those of you actually paying attention, would you prefer that I edit the lettings post with the awarded bids, or create a new post with the awards?

I think the current arrangement works well.  And I do find these posts useful--in fact, I was looking through them earlier this week to try to find the project number (70-106 KA-4744-04) of the contract that resulted in replacement signs for I-70 in Topeka being shipped through Dayton, Ohio.  (I assume the Kansas City-based prime contractor outsourced the sign manufacturing from that far away because it was cheaper than relying on a closer source like Interstate SignWays in Little Rock, but I don't know if they were required to declare their subcontractors and suppliers, or if such declarations are online in a place we can access.)
"It is necessary to spend a hundred lire now to save a thousand lire later."--Piero Puricelli, explaining the need for a first-class road system to Benito Mussolini

route56

#279
Approved Bids announced 10/6/21
Approved Bids announced 11/3/21

September 2021

There are 40 projects up for bids in the KDOT September lettings.

Federal-Aid:

75-43 KA 5710-01: Installation of a "smart" flashing yellow beacon at the intersection of US 75 and 190 Road in Jackson County. The beacon is designed to flash when traffic on the crossroad is detected. J Warren Company Inc., Topeka, $137,525.00.

106 KA 6092-01: Signage upgrade on US 50, US 56, K-99, and K-170 in Lyon County, and the entire length of K-130 in Lyon and Coffey counties. Komo Construction LLC / DBA A&H, Lakeville, Minnesota, $334,514.13

70-105 KA 4744-05: Signage upgrade on I-70 between 110th Street and the Lewis and Clark Viaduct. Notable is the inclusion of the KTA shields on all of the reassurance markers west of 18th Street and the exclusion of a "LEFT" marker on the left exits. Re-let in the November 2021 lettings

81-15 KA 6195-01: Milling and HMA overlay from Eagle Road to the south city limits of Concordia in Cloud County. Hall Brothers Inc., Marysville, Kansas, $3,216,869.54

81-15 KA 6219-01: PCCP patching from the north city limits of Concordia to Union Road in Cloud County. Emery Sapp & Sons Inc. and Subsidiaries, Columbia, Missouri, $637,990.88.

64 KA 6221-01: 1.5-inch HMA overlay on US 56 from Council Grove east to the Morris/Lyon county line and on K-177 from Council Grove north to L Avenue. Bettis Asphalt & Construction Inc., Topeka, $2,136,763.34

81-79 KA 5108-02: Guardrail upgrade on US 81 in Republic County. J & J Contractors Inc., Iola, $250,535.51

85 KA 6222-01: Milling and HMA overlay on K-4 from I-135 to Gypsum, as well as the entire length of K-104. APAC-Kansas Inc. Shears Division, Hutchinson, $2,339,771.69

40-55 KA 6209-01: Milling and HMA overlay from the Wallace/Logan County Line east the east junction US40/K-25. Venture Corporation, Great Bend, $3,759,050.94

106 KA 6107-01: Signage upgrade on US 183 from Plainville to the Rooks/Phillips County line, US 24 from the Graham/Rooks County Line to Alton, K-18 from Palco to US 281, and the entire length of K-258. Komo, $362,494.95

166-11 KA 1005-02: New US 166/US 400 4-lane freeway from the west US 160/US 400 Junction to K-26. Emery Sapp, $54,798,599.55.

16 TE 0446-02: Re-construct the intersections of 3rd and Ogden, 4th and Odgen, and Broadway and Elm, all in Lebo. Killough Construction Inc., Ottawa, $881,581.73.

54 TE 0479-02: Construct new bicycle path along 6th, Cedar, and Locust Streets in Pleasanton

54-8 KA 6348-01: Pavement marking at the US 54 and Andover Road intersection in Andover. Roadsafe Traffic Systems Inc., El Dorado, $60,275.63

135-40 KA 6347-01: Pavement marking on I-135 in Harvey County. Cillessen and Sons Inc., Kechi, Kansas, $436,371.37

73 KA 6227-01: Milling and HMA overlay on K-156 from the Hodgeman/Pawnee county line to Larned, the entire length of K-264, and US 183 from K-156 to the Pawnee/Rush county line. Venture, $6,285,352.50

78 TE 0457-01: Conversion of Washington Street from 17th Avenue to 27th Avenue to a Bicycle Boulevard. Prado Construction LLC, Valley Center, $479,350.50.

87 KA 6349-01: Pavement marking on Kellogg from Meridian to Washington Boulevard, the I-135 ramps at 47th Street, I-135 from 53rd Street to the Sedgwick/Harvey County line, and US 81 from 59th to 71st Street, all in Sedgwick County. Cillessen, $985,689.97.

87 N 0678-01: Reconstruction of Woodlawn Avenue from 37th to 45th in Wichita. Pearson Construction LLC, Wichita, $8,571,662.01

53-96 KA 6225-01: Milling and HMA overlay on K-53 near Mulvane. Pearson Construction LLC, Wichita, Kansas, $109,328.00

177-96 KA 6226-01: Milling and HMA overlay on US 177. Cornejo & Sons LLC, Wichita, $656,064.10.

283-13 KA 6228-01: Surface recycle and chip seal on US 283 from US 160 north to US 54. Bettis, $1,304,200.65

106 KA 6093-01: Signage upgrade on US 56 from the Gray/Ford county line to US 50, US 283 from Wildfire Road to US 56, US 283 from US 50-56 to the Ford/Hodgeman county line, US 50 from US 400 to the Ford/Edwards County line, US 400 on the southwest Dodge City bypass, and US 400 from US 56-283 to Ford. Komo, $479,145.28

Federal-Aid, Local projects:

26 C 5035-01: New roadway along 230th and Feedlot road connecting I-70 west of Hays with US 183 north of Hays. Although this is a logical extension of US 183 Bypass, it appears that this roadway will be maintained by Ellis County. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, Kansas, $9,235,699.66

61 C 5047-01: Reconstruction of Hedge lane at the BNSF Fort Scott Subdivision Crossing near Fontana Killough, $337,226.52.

48 C 5043-01: Replace the Duck Creek and Chikaskia River bridges of SE 70th Road in Kingman County. Replacement of the Chikaskia River bridge is marked as an "Emergency Relief" project. King Construction Company Inc. & Subsidiaries, Hesston, Kansas, $2,751,348.15

106 C 5034-01: Replace multiple bridges in KDOT District 6. Bridges Inc., Newton, Kansas, $8,496,757.22

Non-FA:

106 KA 6291-01: RAP Sample milling in KDOT District 1. Bettis, $43,415.20

435-105 KA 6368-01: Bridge deck patching on I-435 from the Kansas River to the Union Pacific Falls City Subdivision in Wyandotte County. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $864,694.97

177-9 KA 6216-01: Chip seal on K-177 in Chase County. Heft and Sons LLC, Greensburg, $806,356.00

244-31 KA 6252-01: Chip seal on the entire length of K-244. APAC-Kansas, $657,827.10

28-45 KA 6217-01: Chip seal on K-28 from K-14 to K-148. Heft and Sons, $178,813.00

24-62 KA 6218-01: Surface recycle and chip seal on US 24 in Mitchell County. Bettis, $3,688,464.31

148-106 KA 6380-01: Chip seal on K-148 from K-28 to US 81 in Jewell and Republic Counties. Circle C Paving and Construction LLC, Goddard, $612,649.78

36-101 KA 6277-01: Repair gravel shoulders from K-22 to the west city limits of Washington. Hall Brothers, $214,655.00

160-13 KA 6253-01: Chip Seal on US 160 from US 283 to Ashland. Heft and Sons, $338,635.00.

160-13 KA 6286-01: Crack Sealing on US 160 from Ashland to the Clark/Comanche county line. Pavement Pro's LLC, McPherson, $62,286.29

29 KA 6344-01: Crack sealing on US 50 and US 56 around Dodge City. Scodeller Construction Inc., Wixom, Michigan, $48,245.00

283-106 KA 6341-01: Crack sealing on US 283 from Jetmore to Ness City. Pavement Pro's LLC, McPherson, $124,167.00

190-106 KA 6351-01: Chip Seal on K-190 from US 160 in Grant County to US 56 at Satanta. Heft and Sons, $353,218.60.
Peace to you, and... don't drive like my brother.

R.P.K.

kphoger

Quote from: route56 on August 21, 2021, 10:30:24 AM
166-11 KA 1005-02: New US 166/US 400 4-lane freeway from the west US 160/US 400 Junction to K-26.

Do you know if there are any plans to extend the four-laning farther north?
Keep right except to pass.  Yes.  You.
Visit scenic Orleans County, NY!
Male pronouns, please.

Quote from: Philip K. DickIf you can control the meaning of words, you can control the people who must use them.

route56

Lettings for July and August have been updated with the awarded bids announced by KDOT on August 30.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

Quote from: kphoger on August 23, 2021, 01:27:27 PM
Quote from: route56 on August 21, 2021, 10:30:24 AM
166-11 KA 1005-02: New US 166/US 400 4-lane freeway from the west US 160/US 400 Junction to K-26.

Do you know if there are any plans to extend the four-laning farther north?

Not to my knowledge. Incidentally, this contract was originally scheduled to let in July. Either the bids were rejected, no one made a bid, or KDOT pulled the letting at the last minute.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#283
Approved Bids announced 11/3/21
Approved Bids announced 11/3/21

October 2020

Federal-Aid:

3 C 4963-1: Major Collector signage upgrade in Atchison County. CC & I Engineering Inc./ DBA Compass Consultants, Perham, Minnesota, $62,369.91.

3 TE 0489-1: New multi-use path along the south side of Main Street from 10th to 2nd in Atchison. Amino Brothers Company Inc., Kansas City, Kansas, $1,552,299.70.

56-46 KA 5420-01: Reconstruct Main Street from Sycamore Road to Moonlight Road in Gardner. Amino Brothers, $6,130,332.21.

69-46 KA 6121-01: Repair of the US 69 bridges over 179th Street in Johnson County. Comanche Construction Inc., Olathe, $380,969.58.

5-105 KA 5796-01: Guardrail upgrades on the "Fairfax Spur." Bettis Asphalt & Construction Inc., Topeka, $728,719.12.

50-9 KA 6164-01: Replace sections of concrete pavement on US 50 in Strong City. Vogts-Parga Construction LLC, Newton, $1,798,993.56.

14-27 KA 6288-01: 1/2 inch milling and 1 1/2 inch overlay on K-14 from the Rice/Ellsworth County line to Ellsworth. APAC-Kansas Inc. Shears Division, Hutchinson, $3,192,935.91

77-31 KA 2367-05: Reconstruction of US 77 northwest of Junction City with re-alignment of several side road intersections.
77-31 KA 4638-02: Guardrail upgrades on US 77 from Junction City to the Geary/Riley County line.
Ebert Construction Co. Inc. & Subsidiary, Wamego, $11,645,404.67.

31 TE 0495-01: Sidewalk ramp replacement along 7th Street in Junction City.

36-101 KA 3244-01: Reconstruction of 7th Street in Washington into a 3-lane road with a center turn lane. Smoky Hill LLC, Salina, $4,214,825.50.

383-20 KA 6322-01/383-90 KA 6323-01: 3/4 inch Mill and 2-inch overlay from US 83 to Jennings in Sheridan and Decatur counties (KA-6323-01 in Sheridan County is non-FA) Venture Corporation, Great Bend, $3,860,340.98

24-33 KA 3930-01: Bridge replacement over Antelope Creek west of Moreland. Traffic to be carried on a Shoo-fly detour. King Construction
Company Inc. & Subsidiaries, Hesston, $2,394,858.83.


24-33 KA 3960-01: Bridge replacement over Youngs Creek east of Moreland. Traffic to be carried on a Shoo-fly detour. King, $1,489,413.35.

24-33 KA 3961-01: Bridge replacement over Rock Creek east of Moreland. Traffic to be carried on a Shoo-fly detour. King, $1,771,482.95

181-71 KA 3938-01: Bridge replacement over Twin Creek south of Downs. Detour via K-18, US 281, and US 24

84 C 4986-01: Signage replacement on Major collector roads east of US 281 and north of I-70 in Russell County.  Signs Up LTD DBA Haren's Trees And Critters, Webster City, Iowa, $260,885.68.

59-50 KA 3903-01: Replace the bridge over Labette Creek on US 59/US 160 west of Oswego. Detour via US 166 and K-101. A M Cohron & Son Inc., Atlantic, Iowa, $3,188,243.02.

5 KA 6290-01: Mill and Overlay on K-4 in Barton County, including the segment concurrent with US 281. Venture, $6,430,184.00.

56-5 KA 6292-01: Mill and overlay on US 56 from Great Bend to Ellinwood. Venture, $1,569,163.28

96-87 KA 6136-01: Repair of the eastbound K-96 bridges over Little Slough Creek and Ridge Road in northwest Wichita. PCI Roads, LLC, Saint Michael, Minnesota, $506,017.70

50-38 KA 6293-01/50-38 KA 6295-01/50-47 KA 6294-01
Combined: Mill and Overlay from the Colorado State line to Lakin. Venture, $8,482,441.98

4-51 KA 6299-01/4-68 KA 6300-01
Combined: Asphalt overlay on K-4 from the east junction with K-23 to US 283 Venture, $5,347,025.70

54-60 KA 6296-01: Mill and overlay on US 54 from Meade to the Meade/Clark county line. Venture, $4,163,699.35

83-88 KA 6297-01: Ultrathin bonded asphalt surfacing on US 83/US 160 from the south junction of US 83/US 160 to the Seward/Haskell county line. J & R Sand Company Inc., Liberal, $1,114,414.67

Federal-Aid, Local projects:

70 C 4988-01: Bridge replacement of Hoch Road over the South branch Wakarusa River. Reece Construction Company, Inc., Salina, $680,825.39

53 C 4990-01: Replace a bridge over Beaver Creek southeast of Lincoln. L & M Contractors Inc., Great Bend, $539,057.50.

11 C 5002-01: Replace the bridge on SE 110th Street over Center Creek 1 mile west of Faulkner in Cherokee County. Mission Construction Co. Inc., St Paul, Kansas, $497,279.60.

19 C 5003-01: Replace a bridge on South 20th Street over a Tributary to Hickory Creek in southwest Crawford County. Mission Construction, $497,279.60.

63 C 5048-01: Reconstruction of a section of 4500 Road along the west bank of the Verdigris River Heck & Wicker Inc., Parsons, $1,693,581.53

8 C 4998-01: Replace a bridge on SW 157th Terrace over the Little Walnut River southeast of Augusta. A M Cohron, $1,697,580.33

Non-FA:

106 KA 6354-01: Mill and Overlay on US 24 from US 83 to the Thomas/Sheridan county line, as well as K-186 and K-188 in Sheridan County. <span style="color:#e87c7c" class="has-inline-color"><strong>McCormick Excavation & Paving LLC, Stratton, Colorado, $2,071,527.97</strong></span>

106 KA 6435-01: RAP mill sampling at various locations in KDOT district 4. Bettis, $45,482.00.

76 KA 6223-01: Mill and overlay on US 281 from the Barber/Pratt county line to the south city limits of Pratt; US 281 from the north city limits of Pratt to 60th Street; US 54 from K-61 to the beginning of the concrete surface east of Pratt; and K-61 from US 54 to the end of the 4-lane segment east of Pratt. Venture, $6,383,078.33.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

Peace to you, and... don't drive like my brother.

R.P.K.

route56

#285
Approved Bids announced 12/14/21

November 2021

Federal-Aid:

77-58 KA 3924-01: Bridge replacement over Deer Creek west of Oketo. Detour via US 36, K-148/NE-112, and NE-8 Re-let April 2022

81 U 2373-01: Safe Routes to School sidewalk improvements in Manhattan.

70-105 KA 4744-05: Signage upgrade on I-70 between 110th Street and the Lewis and Clark Viaduct. This is a re-let from September 2021. Still part of the plans is the inclusion of KTA shields on all of the reassurance markers west of 18th Street and the lack of the 2009/10th Edition standard "LEFT" marker on the left exits along I-70. Collins & Hermann Inc, Saint Louis, Missouri, $1,799,999.99.

81-15 KA 6059-01: Pavement reconstruction on US 81 from Union Road to the Cloud/Republic County line. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $3,893,845.20.

156-27 KA 5415-01: Addition of turn lanes on K-156 at the K-140 junction. Re-let June 2022

57-31 KA 6201-01/57-64 KA 6199-01: Surface recycle and chip seal on K-57 from I-70 to K-4. Dustrol Inc., Towanda, $2,099,124.76.

70-26 KA 6133-01: Bridge repair of the Westbound I-70 bridge over Yocemento Road and the eastbound and westbound bridges 1 mile east of Yocemento Road.

23-32 KA 6324-01: 1-inch milling and 2-inch overlay on K-23 from Gove to the Gove/Sheridan County Line
23S-32 KA 6325-01: 1-inch milling and 2-inch overlay on the K-23 spur near Grainfield. (Non-FA)
23A-32 KA 6326-01: 1-inch milling and 2-inch overlay on the K-23 Business Route through Grainfield.

8 KA 6229-01: 1.5-inch mill and 1.5-inch overlay on US 54 from El Dorado to the Butler/Greenwood county line and US 77 from 110th to 130th Street. Shilling Construction Co. Inc., Manhattan, $3,267,125.75.

77-18 KA 6224-01: Ultrathin bonded asphalt surfacing from Winfield to the north junction with K-15. APAC-Kansas Inc. Shears Division, Hutchinson, $1,136,773.16.

2-39 KA 6306-01: 2-inch surface recycle and chip seal from the Barber/Harper County line to Anthony. Dustrol, $1,905,062.28.

283-13 KA 6307-01: Milling and HMA overlay from the Oklahoma state line to US 160. APAC-Kansas Inc, $2,844,505.61.

183-13 KA 6312-01: Milling and HMA overlay from the Oklahoma state line to US 160/K-34. APAC-Kansas Inc, $2,968,222.46.

50-28 KA 6158-01: Lighting upgrade at the US 50/US 83 interchange on the northwest side of Garden City and at US 50 and Big Lowe Road northwest of Garden City. IES Holding Inc. & Subsidiaries, Holdrege,
Nebraska, $340,100.00.


50-29 KA 5175-01: Add turn lanes on US 50-56 at Spearville. APAC-Kansas Inc, $2,744,393.83.

23-35 KA 6302-01/23-60 KA 6301-01: 1-inch mill and 1.5-inch HMA overlay on K-23 from north of the Railroad crossing in Meade to US 56 in Meade and Gray Counties. Venture Corporation, Great Bend, $4,303,092.88

83-88 KA 2220-01: Addition of passing lanes on US 83 north of Liberal. Notably, and oddly specific "Passing Lane: 59/64 mile" sign.
83-88 KA 5600-01: Addition of turn lanes US 83 and Salley Road north of Liberal, along with a slip lane from westbound Salley Road to northbound US 83. (Non-FA)
J & R Sand Company Inc., Liberal, $20,262,062.76

160-88 KA 6320-01/160-60 KA 6321-01: 1/2-inch milling and 1.5-inch overlay on US 160 from US 83 to US 54 in Seward and Meade counties. (Meade County section is non-FA) J & R Sand, $2,394,190.98

Federal-Aid, local projects.

31 C 4953-01: Replacement of the Ascher Road bridge over Clarks Creek. Detour via Clarks Creek Road, I-70, and Humboldt Creek Road. Ebert Construction Co. Inc. & Subsidiary, Wamego, $1,457,076.68.

45 C 4949-01: Replacement of a bridge along the Jewell/Republic County line ~ 2 miles north of K-148. L & M Contractors Inc., Great Bend,  $568,660.85.

101 C 4961-01: Replacement of the bridge on 14th Road over Ash Creek.  Reece Construction Company, Inc., Salina, $692,712.28

10 C 4952-01: Replace a bridge over North Caney Creek on a new alignment upstream of the existing bridge. The existing bridge is a steel beam bridge noted to remain in place. B & B Bridge Company LLC, St. Paul, Kansas, $785,206.97

18 C 4955-01: Replace this bridge over Grouse Creek in Cowley County. B & B Bridge, $1,028,436.51.

Non-FA:

21 KA 6376-01: Chip seal on K-18 and K-15/K-18 from the Ottawa/Dickinson County line to the east junction of K-15/K-18. Circle C Paving and Construction LLC, Goddard, $426,804.20.

77-31 KA 6431-01: Crack sealing from Golden Belt Boulevard (near the I-70 junction at Junction City) to the Geary/Riley County line. Scodeller Construction Inc., Wixom, Michigan, $161,636.62.

56-57 KA 6433-01: Crack sealing from the McPherson/Marion county line to the east junction with K-15. Scodeller, $216,620.50.

101 KA 6432-01: Crack sealing on K-9/K-15 from the Clay/Washington County line to K-148, along with the K-115 spur to Palmer. Pavement Pro's LLC, McPherson, $55,120.40.

123-90 KA 5568-01/123-20 KA 5569-01: Full-depth pavement replacement on K-123. Detour via K-23, K-223, and K-383. McCormick Excavation & Paving LLC, Stratton, Colorado, $4,420,586.88

68-106 KA 6372-01: Chip Seal on K-68 from K-33 to the Franklin/Miami County line. Vance Brothers Inc. and Subsidiary, Kansas City, Missouri, $459,863.65.

160-4 KA 6139-01: Tree clearing along US 160 in western Barber County. Prado Construction LLC, Valley Center, $1,231,054.80.

183-24 KA 3266-01: Reconstruction of Niles Avenue (US 183) in Kinsley. Detour via US 50 and US 56. Vogts-Parga Construction LLC, Newton, $5,817,680.94

50-40 KA 6390-01: Concrete Patching at various ramps between US 50 and I-135, as well as US 50 and K-15 in Newton. Vogts-Parga, $1,179,492.00.

400-29 KA 6298-01: 1.5-inch milling and 1.5-inch Overlay from US 56/US 283 to Ford. APAC-Kansas Inc, $3,595,746.06. 

50-29 KA 6423-01: Guardrail upgrade on US 50 near Bellefont. Bettis Asphalt & Construction Inc., Topeka, $114,188.80.

50-38 KA 6424-01: Guardrail upgrade on US 50 near Coolidge. Bettis, $137,713.50.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

October and the remaining September awarded bids were announced by KDOT on November 3rd. Posts have been updated with the approved bids.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#287
43 projects are up for bids at KDOT on December 15, including two major projects on US 50 around Dodge City and into the territory out west.

Approved Bids announced 12/28/21
Approved Bids announced 1/27/22

December 2021:

Federal-Aid: (unless otherwise noted)

75-7 KA 5284-01: Addition of left-turn lanes at the intersection of US 75 and 260 Road and at 280 Road/K-246 at Sabetha. Herzog Contracting Corp., St. Joseph, Missouri, $5,414,193.56.

7-46 KA 5933-01: HMA overlay from Harold Street to just south of the K-10 interchange in Olathe. Superior Bowen Asphalt Company LLC, Kansas City,
Missouri, $4,729,867.13


187-66 KA 3875-01: Replace the K-187 bridge over Weyer Creek 2.78 miles north of the K-187/K-9 junction.
187-66 KA 3876-01: Replace the K-187 bridge over Nemaha River drainage 5.53 miles north of the K-187/K-9 junction.
Projects to be let together and intended to be constructed together with a common detour via K-9, K-63, and US 36.
Reece Construction Co., Inc., Salina, $2,360,961.91

31-99 KA 6316-01: 1-inch milling and 1.5-inch overlay on K-31 in Wabaunsee County.
195-99 KA 6339-01: 1-inch milling and 1.5-inch overlay on the K-195 spur from K-31 to Harveyville (Non-FA)
Shilling Construction Co. Inc., Manhattan, $1,546,390.17

128-45 KA 3947-01: Replace the K-128 bridge over White Rock Creek located 0.3 miles north of Burr Oak. Traffic to be carried via a shoo-fly detour. King Construction Company Inc. & Subsidiaries, Hesston, $2,750,542.65.

106 KA 6106-01: Signage replacement on US 56, US 77, K-4, and K-177 in and around Morris County. KOMO Construction LLC / DBA A&H Co., Elko New Market, Minnesota, $477,255.50

27-12 KA 3933-01: Replace the K-27 bridge over North Fork Beaver Creek located 1.29 Miles North of the Cheyenne/Sherman County Line. King, $2,329,185.70.

183-26 KA 5418-01: Reconstruct Vine Street (US 183) in Hays from the US 183 Bypass to 12th Street as a 5-lane urban arterial. Smoky Hill LLC, Salina,
$3,532,366.10


9-69 KA 6310-01: 2.5-inch milling and 4-inch overlay from the Decatur/Norton county line to US 283. Venture Corp., Great Bend, $5,574,599.20

70-84 KA 6279-01: Lighting upgrade at I-70 exit 199, and at the K-18/K-232 junction near Lucas. Phillips Southern Electric Company Inc., Wichita, $221,417.00

83-97 KA 6308-01: 2.5-inch milling and 4-inch overlay on US 83 from US 24 to the Thomas/Sheridan County Line. McCormick Excavation & Paving LLC, Stratton, Colorado, $4,504,875.67.

39-6 KA 3912-01: Replacement of the K-39 bridge over Flat Rock Creek 3.08 miles east of the Bourbon/Neosho County Line. Detour via US 59, US 54, and K-3. Killough
Construction Inc., Ottawa, $722,897.60


3-6 KA 6303-01/3-54 KA 6449-01: 1-inch milling and 2-inch overlay on K-3 between US 54 and K-31 in Bourbon and Linn Counties (KA-6449-01 in Linn County is Non-FA) Cornejo & Sons LLC, Wichita, $2,066,429.82.

35-70 KA 6075-01/35-30 KA 6076-01: 1-inch PCC milling and 3-inch HMA overlay from MP 163.2 to MP 179 in Osage and Franklin Counties.
35-70 KA 6126-01: Repair the northbound I-35 bridge over Rock Creek at MP 163.2. Bettis Asphalt & Construction Inc., Topeka, Kansas, $20,252,759.15

400-50 KA 6304-01: 1.5-inch milling and 1.5-inch HMA overlay from the Montgomery/Labette County Line to just west of Jackson Road near Parsons. Cornejo & Sons, $1,515,236.03.

68-61 KA-2373-02: Add Turn lanes to the intersection of K-68 and Somerset Road and construct a new access road to serve the Louisburg Cider Mill.
68-61 KA 2373-03: Reconstruct K-68 between US 169 and US 69. Add turn lanes and frontage roads.
Miles Excavating Inc., Basehor, $18,824,344.89.

68-61 KA 6230-01: 1.5-inch mill and 1.5-inch HMA overlay from US 69 to the Missouri State Line. Bettis, $1,197,179.65

77-8 KA 6132-01: Repair the US 77 bridge over the West Branch Walnut River in El Dorado. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $260,766.78.

18 KA 6305-01: 1.5-inch milling and 2-inch HMA overlay on US 166 from Arkansas City to the Cowley/Chautauqua County Line and 0.5-inch mill and 2-inch overlay on K-15 from the Oklahoma State Line to US 166
77-18 KA 6333-01: Milling and HMA overlay (unspecified depth) on US 77 from Summit Street to Madison Avenue in Arkansas City. Cornejo & Sons, $7,183,574.81

96-87 KA 6231-01: Concrete patching on K-96 from Webb to Kellogg. Prado Construction LLC, Valley Center, $2,791,865.53

50-35 KA 2383-01/50-29 KA 2384-01: Widen to a 4-lane expressway from Cimarron to Wyatt Earp Boulevard in Dodge City. Koss Construction Colorado, Topeka, $86,833,640.25

23-51 KA 6311-01: 1.5-inch milling and 1.5-inch HMA overlay on K-23 in Lane County.
96-51 KA 6334-01 1.5-inch milling and 1.5-inch HMA overlay on K-96 in Dighton (Non-FA)
Venture, $5,561,201.00

Federal-Aid, Local project:

44 C 4983-01: Reconstruct a portion of Wellman Road near 142nd Street south of Winchester. Leavenworth Excavating & Equipment Company
Inc. and Affiliate, Leavenworth, $380,102.22


Non-FA:

36-22 KA 6336-01: Surface Recycle and Chip Seal on US 36 from Troy to Wathena. Dustrol Inc., Towanda, Kansas, $768,205.51.

120-22 KA 6337-01: 2.5-inch milling and 2-inch overlay on the entire length of K-120 in Doniphan County. Herzog, $1,368,463.98

7-6 KA 6486-01: Chip Seal from K-31 to the Bourbon/Linn County Line. Vance Brothers Inc. and Subsidiary, Kansas City, Missouri, $45,861.83.

7-6 KA 6487-01: Chip Seal from US 54 to K-31. Vance Brothers, $316,143.10.

69-61 KA 6055-01: 1-inch PCC milling and 3-inch HMA overlay from MP 110.2 to MP 121.0. Bettis, $13,286,740.10

31-6 KA 6489-01: Chip Seal from K-7 to US 69. Vance Brothers, $187,063.96

7-54 KA 6488-01: Chip Seal from the Bourbon/Linn County line K-52 near Mound City. Vance Brothers, $211,591.12

160-63 KA 6389-01: 1.5-inch milling and 1.5-inch HMA Overlay from Independence to US 169. Cornejo & Sons, $907,756.12

4 KA 6289-01: 1/2-inch milling and 2-inch HMA overlay on K-2 in Barber County; 1.5-inch milling and 1.5-inch HMA Overlay on K-8 in Barber County. Cornejo & Sons, $3,390,836.04.

106 KA 6378-01: Rumble strip grinding at various locations in Butler, Sedgwick, and Cowley Counties.

83-86 KA 3252-01: 2-inch milling and 2-inch HMA Overlay from Scott City to the Scott/Logan County Line. Venture, $5,451,392.04.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

As of today (12/9/21) awards for the KDOT November letting have not been published.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

It took a bit longer than normal, but the lettings lists for October and November have been updated with awarded bids announced on December 14
Peace to you, and... don't drive like my brother.

R.P.K.

route56

There are 41 projects up for letting at KDOT's January 19 letting, including many asphalt overlays of concrete roadways.
Approved Bids announced 1/27/22.
Approved Bids announced 3/2/22.

January 2022

Federal-Aid:

192-44 KA 6235-01/192-52 KA 6238-01: (combined) 1-inch milling and 1.5-inch HMA overlay along the entire length of K-192 in Jefferson and Leavenworth Counties. Herzog Contracting Corp., St. Joseph, Missouri, $2,613,846.74.

4-44 KA 6315-01/59-44 KA 6338-01: 1-inch milling and 1.5-inch HMA overlay on K-4 from K-92 to US 59, and continuing northeast on US 59 from K-4 to the Jefferson/Atchison County Line (US 59 portion of the project is non-FA) Herzog, $4,770,585.37.

35-46 KA 6502-01: Pavement marking on I-35 from the Miami/Johnson County line to Olathe

50-56 KA 6398-01: 3-inch overlay from the Chase/Lyon County Line to Road E5 west of Emporia. APAC-Kansas Inc. Shears Division,  Hutchinson, $3,035,190.16.

35-56 KA 6401-01: 1.5-inch HMA overlay from US 50 at Exit 133 to the Lyon/Coffey County line
50-56 KA 6422-01: Milling and HMA overlay on US 50 from the East City Limits Emporia to I-35 Exit 133 (non-FA)
APAC-Kansas, $5,603,729.17.

89 TE 0494-01: New shared-use path along the north side of SW 10th Street between Wanamaker Road and Robinson Avenue in Topeka (Re-let from August 2021) Conroy Contractors Inc., Topeka., $389,814.30

106 KA 6096-01: Signage upgrade on US 24, US 77, K-18, K-82, K-113, K-114, and K-177 in Riley County — including the K-18 freeway west of Manhattan. Cooper Construction LLC, Emporia, $1,839,487.15.

56-59 KA 5416-01: Reconstruction of the US 156/K-153 intersection.  Pearson Construction LLC, Wichita, $665,685.10

41-72 KA 6131-01: Repair of the K-41 bridge over Dry Creek PCI Roads, LLC, Saint Michael, Minnesota, $783,114.68.

15-101 KA 3959-01: Replace the K-15 bridge over Ash Creek south of Washington. Traffic to be carried on a shoo-fly detour. King Construction Company Inc. & Subsidiaries, Hesston, $2,836,317.49.

40-55 KA 6500-01/40-32 KA 6501-01: (combined) Pavement marking replacement of US 40 from the west junction with US 83 west of Oakley to I-70 east of Oakley in Logan and Gove Counties Roadsafe Traffic Systems Inc., El Dorado, $485,078.34.

40-55 KA 3915-01: Replace the US-40 bridge over North Bridge Hackberry Creek between Monument and Oakley. The new bridge will be constructed to the southeast of the present bridge. Sporer Land Development Inc., Oakley, $1,843,397.48.

70-98 KA-5688-01: Repair of the I-70 bridges over K-147 near Ogallah PCI Roads, $569,899.90.

54-1 KA 6408-01/54-104 KA 6407-01: (combined) 1.5-inch milling and 1.5-inch HMA overlay from the East City limits of Yates Center to the West City Limits of Iola. Shilling Construction Co. Inc., Manhattan, $3,301,196.72.

99-10 KA 6317-01/99-25 KA 6340-01: 1.5-inch milling and 1.5-inch HMA overlay from US 166B in Chautauqua County to US 160 in Elk County. (Elk County segment is non-FA) Cornejo & Sons LLC, Wichita, $3,157,813.66.

35-16 KA 6402-01: 2.5-inch milling and 2-inch HMA overlay from the Lyon/Coffey County line to US 75 at BETO Junction. Bettis Asphalt & Construction Inc., Topeka, $7,043,640.73.

59-50 KA 6319-01: 1-inch milling and 1-inch HMA overlay from the Oklahoma State Line to the North City Limits of Oswego Emery Sapp & Sons Inc. and Subsidiaries, Columbia, Missouri, $2,148,386.05.

169-61 KA 6241-01: 1-inch RCI and 3-inch HMA overlay on the northbound and southbound lanes of US 169 from MP 129.0 North to MP 139.6 near Paola Bettis, $6,695,806.07.

169-63 KA 6412-01: 1.5-inch milling and HMA overlay on the four-lane segment of US 169 east of Coffeyville
166-63 KA 6411-01: 1.5-inch milling and HMA overlay on the four-lane US 166/US 169 concurrency (non-FA)
Bettis, $2,970,157.93.

42-48 KA 6332-01/42-4 KA 6331-01/42-76 KA 6330-01: (combined) 1.5-inch milling and 1.5-inch HMA overlay on K-42 from US 281 to K-14 in Pratt, Barber, Kingman Counties. (Barber county segment is Non-FA) APAC-Kansas, $8,687,896.90.

14-80 KA 3893-01: Replacement of the Cow Creek Drainage Bridge (032) south of Lyons. A new bridge will be built parallel to the existing bridge. Traffic in later phases of the project to be reduced to one lane controlled by traffic signals. King, $4,321,593.70.

54-87 KA 6088-01: Replace deck and rails, add shear studs, paint superstructure, replace approach pavement, and steel repair on the westbound US 54 bridge over K-251. Traffic moving head-to-head in the eastbound lanes. A. M. Cohron & Son Inc., Atlantic, Iowa, $2,042,006.34.

166-96 KA 6430-01: 1-inch RCI and two 1.5-inch overlays on US 166 from US 81 to Rock Road. Concrete patching and 3-inch overlay on the segment near the Turnpike. Cornejo & Sons LLC, Wichita, $9,844,401.56..

Federal-Aid, Local Projects:

43 C 5078-01: Replace the bridge on T Road over Straight Creek southeast of Netawaka King Construction Company Inc & Subsidiaries, Hesston, $622,967.60

Non-FA:

36-7 KA 6391-01: 1.5-inc surface recycle and chip seal from the Nemaha/Brown County Line to Hiawatha. Dustrol Inc.,  Towanda, $1,455,797.33.

99-56 KA 6392-01: Chip seal from the Greenwood/Lyon County Line to Emporia. Circle C Paving and Construction LLC, Goddard, $482,661.50.

75-70 KA 6394-01: 1.5-inch surface recycle and chip seal from the Coffey/Osage County Line to Jordan Road. Dustrol, $999,752.83.

75-70 KA 6395-01: 2-inch milling and 2-inch HMA overlay on US 75 from K-68 to K-31/K-268. Killough Construction Inc., Ottawa, $1,429,456.43.

75-70 KA 6396-01: Chip seal from K-31/K-268 to the beginning of the 4-lane south of US 56. Circle C Paving and Construction LLC,  Goddard, $468,466.41.

106 KA 6358-01: 1-inch surface recycle and chip seal on K-58 from Madison to Leroy and on K-248. Dustrol, $3,004,770.93.

254-8 KA 5556-01: Reconstruction of westbound K-254 at Adams Road. Pearson Construction LLC, Wichita, $293,382.50.

254-87 KA 5554-01: Reconstruct the intersection of K-254 and Rock Road. Pearson, $642,116.20.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

Peace to you, and... don't drive like my brother.

R.P.K.

route56

Somehow, my post with the February letting did not get posted: 

February 2022

25 projects are up for bids at KDOT on February 16

Approved bids announced 3/2/22
Approved bid announced 3/31/22


Federal-Aid (unless noted)

10-23 KA 6281-01: Lighting upgrade on the K-10/E 1900 Road interchange between Lawrence and Eudora. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $224,350.00.

56-46 KA 6243-01: 2-inch milling and 2-inch HMA overlay on the state-maintained portion of the Shawnee Mission Parkway. Superior Bowen Asphalt Company LLC, Kansas City, Missouri, $1,797,830.30.

24-52 KA 6240-01/24-23 KA 6239-01: HMA patching and 5/8-inch Ultrathin bonded asphalt surfacing on US 24-40 from K-32 near the Douglas/Leavenworth County Line to K-16 in Tonganoxie (the Douglas County portion is Non-FA) Superior Bowen, $1,204,750.44

87-58 KA 6314-01: Patching and 1.5-inch overlay along the entire length of K-87.
36-66 KA 6313-01/36-58 KA 6335-01: 2.5-inch milling and 2-inch overlay from K-87 in Marshall County to the west junction K-63 near Seneca (Marshall County segment is non-FA)
Hall Brothers Inc., Marysville, Kansas, $5,849,269.02

99-58 KA 6417-01/9-58 KA 6416-01: 1/2-inch milling and 1 1/2-inch HMA Overlay on K-99 from the North city limits of Frankfort to US 36. (K-9/K-99 concurrency segment north of Frankfort is Non-FA) Hall Brothers, $2,361,889.69

9-66 KA 6414-01/9-58 KA 6413-01: 2-inch milling and 1.5-inch HMA overlay on K-9 from K-87 in Marshall County to the south junction K-63 at Centralia (Marshall County segment is Non-FA)
63-66 KA 6415-01: 2-inch milling and 1.5-inch HMA overlay from the Pottawatomie/Marshall County Line to the south junction with K-9 at Centralia (Non-FA)
Hall Brothers, $6,515,375.84

81 U 2373-01: Safe Routes to School sidewalk improvements in Manhattan. Ebert Construction Co. Inc. & Subsidiary, Wamego, Kansas, $436,672.15

70-89 KA 6122-01: Repair of bridges along I-70 between 1st Street and Adams Street in Topeka. Wildcat, $5,574,579.70.

99-99 KA 6397-01: 2.5-inch milling and 2-inch HMA overlay from the West Junction with K-4 to the Wabaunsee/Pottawatomie County Line, excluding the segment through Alma and the new alignment that is currently under construction. Shilling Construction Co. Inc., Manhattan, $3,436,561.13

59 U 2371-01: Replace the Durst Street bridge over Black Kettle Creek in Moundridge. Ward Davis Builders Inc., Hutchinson, Kansas, $228,620.20.

146-67 KA 6134-01: Repair the K-146 bridge over Rock Creek. Detour via US 59, K-47, and K-3. Mission Construction Co. Inc., St Paul, Kansas, $287,182.86

14-78 KA 5798-01: Guardrail reconstruction on K-14/K-96 near South Hutchinson. Bettis Asphalt & Construction Inc., Topeka, Kansas, $311,580.73

61-78 KA 6135-01: Repair two sets of bridges on K-61 over the BNSF Railroad in Hutchinson

54-87 KA 6233-01: Repair the approaches to the bridges on Kellogg over Maize Road, Cowskin Creek, and Eastern Street in Wichita. Cornejo & Sons LLC, Wichita, Kansas, $843,538.80

Non-FA:

237-44 KA 6399-01: 1.5-inch milling and 1.5-inch overlay along the entire length of K-237. Bettis, $1,139,749.53

156-27 KA 5553-01: Add turn lanes to the K-156/K-14 intersection south of Ellsworth. Venture Corporation, Great Bend, Kansas, $1,337,145.50.

106 KA 6385-01: 1/2-inch milling and 1.5-inch HMA overlay on US 77 from US 56 to K-209 in Dickinson and Morris Counties, and the entire length of K-218. Shilling, $2,096,894.50.

69-61 KA 6524-01: Crack Sealing on US 69 from the Linn/Miami County Line to 367th Street. Scodeller Construction Inc., Wixom, Michigan, $304,284.75

105-104 KA 6373-01: Chip Sealing on K-105 from MP 0 to MP 9.831. Vance Brothers Inc And Subsidiary, Kansas City, Missouri, $288,285.50
Peace to you, and... don't drive like my brother.

R.P.K.

route56

#293
March 2022

Approved Bids announced 3/31/22
Approved Bids announced 5/2/22

There are 34 projects up for bids on March 16.

Federal-Aid:

56-46 KA 6246-01: 2-inch milling and 2-inch HMA overlay on Main Street in Gardner
56-46 KA 6370-01: 3-inch HMA overlay (2 1.5-inch layers) on the concrete section of US 56 between the New Century Air Center and I-35.
Superior Bowen Asphalt Company LLC, Kansas City, Missouri, $1,728,737.05.

70-89 KA 1266-06: Demolish all structures between Topeka Boulevard on the west, 2nd Avenue on the South Kansas Avenue on the east, and 1st Street on the north, with the exception of 124 SW Harrison, to make way for the replacement of the Polk-Quincy viaduct. Bettis Asphalt & Construction Inc., Topeka, Kansas, $1,999,035.00.

4-89 KA 6127-01: Bridge repair of the Oakland Expressway bridge over Shunganunga Creek and the BNSF Topeka Sub. PCI Roads, LLC, Saint Michael, Minnesota, $606,868.75.

75-89 KA 6128-01: Bridge repair of the US 75 bridges over Topeka Boulevard. PCI Roads, $2,549,668.42.

4-89 KA 6244-01: 1/2-inch milling and 1.5-inch HMA overlay on K-4 from the Wabaunsee/Shawnee County line to I-70. Bettis, $2,850,806.88

24-89 KA 6393-01: (up to) 7-inch milling and 7-inch HMA overlay on US 24 between Rochester Road and Topeka Boulevard. Detour signage refers to US 24 as "K-24." Superior Bowen, $1,724,304.43.

30-99 KA 6245-01: 1.5-inch milling and 1.5-inch HMA overlay along the entire length of K-30. Bettis, $489,475.17.

105 KA 5495-02: Lighting upgrade along I-670 and I-70 from the I-70/I-670 junction to the Missouri State Line Re-let May 2022

73-105 KA 5498-01: Improvements to the intersection of US 73/K-7 and Hollingsworth Road. Miles Excavating, Inc., Basehor, $846,304.51.

635-105 KA 6086-01: Bridge re-decking on the flyover ramp from westbound I-70 to southbound I-635. Clarkson Construction Company, Kansas City, Missouri, $6,031,010.26

70-105 KA 6369-01: Asphalt patching, partial depth concrete patching of approach pavement, full depth PCCP patching, cold milling to 2"  depth, and replacing with 2"  HMA Overlay on I-70 between 78th Street and the Lewis and Clark Viaduct. Superior Bowen, $13,161,769.50.

70-21 KA 6406-01: PCCP patching and 4-inch (2.5-inch base, 1.5-inch finishing layer) HMA overlay from Chapman to the Dickinson/Geary County Line. APAC-Kansas Inc. Shears Division, Hutchinson, Kansas, $1,682,930.05.

40B-31 KA 3952-01: Replace the 6th Street bridge over the UP Salina Subdivision and Monroe Street in Junction City. Traffic detoured via I-70. King Construction Company Inc. & Subsidiaries, Hesston, $15,957,363.42.

70-31 KA 6278-01: PCCP patching from Grandview Plaza to the Geary/Wabaunsee County Line. R A Knapp Construction Inc., Lenexa, $3,264,702.50.

31 TE 0495-01: Sidewalk Ramp replacement at multiple intersections in Junction City. Prado Construction LLC, Valley Center, $768,812.50

143-85 KA 3940-01: Replacement of Bridge No. 104 located at the intersection of K-143/Shipton Road and removal of Bridge No. 103 at the intersection of K-143/Granville Road. L & M Contractors Inc., Great Bend, $668,194.00.

283-33 KA 6418-01: 2-inch milling and 2-inch HMA overlay on US 283 from Hill City to the Graham/Norton County Line. Venture Corporation, Great Bend, $3,612,818.90.

24-33 KA 6419-01: 2-inch milling and 2-inch HMA overlay on US 24 from Hill City to K-18 Venture, $1,886,455.12.

181-71 KA 3938-01: Replacement of the K-18 bridge over Twin Creek, located 5.99 miles south of US-24. Detour via K-18, US 281, and US 24. Bridges Inc., Newton, Kansas, $1,585,322.53.

36-74 KA 6002-01: Guardrail replacement on US 36 in between Phillipsburg and Agra. Bettis, $1,727,949.50.

281-84 KA 2370-03: Full-Depth reconstruction of US-281 from Land Road north to the US-281/K-18 junction. Detour via I-70, K-232, and K-18. Sporer Land Development Inc., Oakley, Kansas, $35,972,721.00.

69-6 KA 5563-01: Intersection improvements and traffic signal upgrades on US 69 at 25th, 12th, 6th, and 3rd Streets in Fort Scott. Of note, the plans stipulate at FYA protected/permitted left turn signal for US 69 at 25th where there is only one overhead signal for two lanes of thru movement. 25th Street traffic will have protected-only left turns. LaForge & Budd Construction Company Inc., Parsons, $2,645,573.03.

166B-10 KA 4997-01: Replace the US 166B/K-99 Bridge over Deer Creek on US-166B west of Sedan. K-99 traffic detoured via US 166 and the west leg of US 166B. B & B Bridge Company LLC, St. Paul, $1,173,443.79.

68-70 KA 6328-01/68-30 KA 6329-01: 2-inch milling and 2-inch HMA overlay on K-68 from K-268 north of Quenemo to Eisenhower Road west of Ottawa in Osage and Franklin Counties. (Osage County segment is Non-FA) Bettis, $4,364,606.41

87 N 0717-01: Reconstruction of Academy Avenue in Maize. Pearson Construction LLC, Wichita, $6,681,860.00.

54-60 KA 6130-01: Repair of two bridges on US 54 southwest of Fowler. Traffic Detoured via K-23 and K-98. Bridges, Inc., $909,070.95.

Federal-Aid, Local projects:

75 TE 0501-01: New Multi-Use trail along Green Valley Road in East Manhattan

85 C 5061-01: Reconstruction of Simpson Road between Magnolia Road and Crawford Street in Saline County. Detour via Holmes Road. Malm Construction Company, Lindsborg, $858,148.44

61 N 0709-01: Reconstruction of Metcalf Road between 287th Street (Miami County grid) and 2nd Street (City Grid) in Louisburg. Includes a hybrid pedestrian signal at Thomas Drive and a signalized intersection with FYA at 5th Street. Miles Excavating, Inc., Basehor, $4,229,588.10.

Non-FA:

82 K 1659-07: 1.5-inch HMA overlay on the road serving Webster State Park from US 24 in Rooks County
258-82 KA 6379-01: 2-inch milling and 2-inch HMA overlay along the entire length of K-258.
Venture, $1,109,376.50

11 KA 6371-01: 1.5-inch milling and 1.5-inch HMA overlay on US 69A and US 166 through Baxter Springs. Blevins Asphalt Construction Company Inc., Mt. Vernon, Missouri, $1,170,571.38.
Peace to you, and... don't drive like my brother.

R.P.K.

route56

January and February poroject listings updated with awarded bids announced today (March 2)
Peace to you, and... don't drive like my brother.

R.P.K.

route56

Approved bids announced 5/2/22
Approved bids announced 5/31/22

Beginning my 8th year with this thread ;) 21 Projects are up for bids on April 20.

April 2022


Federal-Aid (unless otherwise noted):

59-3 KA 5999-01: Guardrail upgrades at eight locations beginning at 0.028 miles south of 222nd Street north to 0.011 miles north of Ottawa Road in Atchison County. J & J Contractors Inc., Iola, $1,651,471.67

35-46 KA 6502-01: Pavement Marking from the Miami/Johnson County line to Lone Elm Road in Olathe. K & G Striping Inc., DBA Twin Traffic & Traffic Zone Services, Riverside, Missouri, $411,574.95

77-58 KA 3924-01: Replacement of the Deer Creek Bridge (019) located 8.88 miles north of the west US-77/US-36 junction west of Oketo. Detour via US 36, K-99/NE 99, and NE 8

105 N 0710-01: Safe Routes to School Phase G for Caruthers Elementary and Northwest Middle School in KCK. Julius Kaaz Construction Co. Inc., Leavenworth, $977,792.50

15-14 KA 6129-01: Repair the bridge over the Republican River south of Clay Center. Wildcat Construction Co Inc & Subsidiaries, Wichita, $1,552,225.05.

70-31 KA 6083-01: Redeck the McDowell Creek Road bridge over I-70 in Geary County. Detour via I-70, turning around at Exit 303 (K-18) or Exit 313 (K-177) King Construction Company Inc & Subsidiaries, Hesston, $1,196,034.80.

62 U 2330-03: Safe Routes to School project along 8th Street in Beloit. APAC-Kansas Inc., Shears Division, Hutchinson, Kansas, $685,499.50.

36-74 KA 5433-01: Full-depth reconstruction of State Street in Phillipsburg from 5th Street to 8th Street. Vogts-Parga Construction LLC, Newton, $2,637,337.47.

181-92 KA 6421-01/181-71 KA 6420-01: 1-inch milling and 2-inch HMA overlay on K-181 from US 24 to US 36/US 281 in Osborne and Smith Counties (Osborne County Segment is Non-FA) Venture Corporation, Great Bend, Kansas, $3,971,947.19.

35-30 KA 6367-01/35-61 KA 6366-01: 1-inch RCI and 3-inch HMA overlay on I-35 from the Wolf Creek bridge northeast of Ottawa to the Miami/Johnson County Line. Bettis Asphalt & Construction Inc., Topeka, Kansas, $15,594,767.31.

8 N 0714-01: Widening of Andover Road from Redbud Trail to Ira Court in Andover, including a new traffic signal at Allison Street. Wildcat, $4,527,664.92

61-78 KA 6135-01: Repair the bridges over the BNSF Railway in Hutchinson. Wildcat, $1,765,950.35.

183-83 KA 5921-01: Reconstruction of the intersection of 12th and Main Streets in La Crosse. Morgan Brothers Construction, Inc., Lacrosse, Kansas, $483,909.50.

Non-FA:

75-89 KA 6469-01: Installation of an ITS conduit at the NW 35th Street interchange north of Topeka. J Warren Company Inc., Topeka, Kansas, $45,511.00

106 KA 5705-01: Expansion of the KC SCOUT ITS system. Gerstner Electric Inc., Fenton, Missouri, $5,294,935.00

36-69 KA 5419-01: Reconstruction of East Holme Street in Norton. Eastbound traffic Detoured via State Avenue and Main Street.

106 KA 6528-01: RAP Sample milling at various locations in KDOT District 3. McCormick Excavation & Paving LLC, Stratton, Colorado, $22,038.00

4 KA 6548-01: Mudjacking of the approaches to the US 160 bridges over Bear Creek and Bitter Creek, and the K-2 bridge over the Medicine Lodge River.

87 KA 6546-01: Mudjacking of the approaches of 23 bridges in Sedgwick County.</p>
Peace to you, and... don't drive like my brother.

R.P.K.

J N Winkler

Quote from: route56 on March 20, 2022, 01:23:39 PM77-58 KA 3924-01: Replacement of the Deer Creek Bridge (019) located 8.88 miles north of the west US-77/US-36 junction west of Oketo. Detour via US 36, K-99/NE 99, and NE 8

Includes this gem:



The plans also call for covering up arms on several Nebraska junction diagrammatics.
"It is necessary to spend a hundred lire now to save a thousand lire later."--Piero Puricelli, explaining the need for a first-class road system to Benito Mussolini

mvak36

Quote from: J N Winkler on March 21, 2022, 05:56:35 PM
Quote from: route56 on March 20, 2022, 01:23:39 PM77-58 KA 3924-01: Replacement of the Deer Creek Bridge (019) located 8.88 miles north of the west US-77/US-36 junction west of Oketo. Detour via US 36, K-99/NE 99, and NE 8

Includes this gem:



The plans also call for covering up arms on several Nebraska junction diagrammatics.

That is a really pretty sign. I might be biased but I really like Nebraska's state route shields.
Counties: Counties visited
Travel Mapping: Summary

Sani

From the February bids:

Quote56-46 KA 6243-01: 2-inch milling and 2-inch HMA overlay on the state-maintained portion of the Shawnee Mission Parkway. Superior Bowen Asphalt Company LLC, Kansas City, Missouri, $1,797,830.30.

Does the state-maintained portion include the bridge over I-35? Because it's gotten pretty rough.

As an aside, I suggested to KDOT that they consider rebuilding that interchange into a DDI to help with rush hour traffic volumes. It should be relatively inexpensive, since it looks like there's sufficient room within the existing geometry for it without having to rebuild the bridge over I-35 or the viaduct over the railroad (said the guy who's not a highway engineer but played a lot of SimCity as a kid).

route56

Approved Bids announced 5/31/22
Approved Bids announced 7/6/22

May 2022

There are 20 projects slated for letting on May 18.

Federal-Aid:

10-46 KA 6085-01: Rehabilitation of three bridges on Westbound K-10 in DeSoto. Clarkson Construction Company, Kansas City, Missouri, $4,486,081.58.

105 KA 5495-02: Lighting upgrade in the vicinity of the I-70/I-670 junction in KCK. Capital Electric Line Builders Inc., Riverside, Missouri, $1,563,444.90.

635-105 KA 6087-01: Rehabilitation of the Shawnee Road bridge over I-635. Miles Excavating, Inc., Basehor, $2,711,569.21.

15-21 KA 6124-01: Repair the K-15 bridge over the Smoky Hill River south of Abilene. PBX Corporation &amp; Subsidiary, Sapulpa, Oklahoma, $639,042.69.

135-59 KA 6063-01: Rehabilitation (possible full depth reconstruction) of I-135 from the Harvey/McPherson County line to the North junction with K-260. Koss Construction Co., Topeka, $19,189,012.05.

135-59 KA 6283-01: Lighting upgrade at the north junction of I-135 and K-260. Atlas Electric, LLC, Wichita, $197,207.00.

64-59 KA 6544-01: Pavement marking on K-61 from the Reno/McPherson County Line to US 81B. Cillessen and Sons Inc., Kechi, Kansas, $1,033,441.40

4-64 KA 5984-01: Reconstruction of MacKenzie Street from 5th Street to Grand Street in White City. Ebert Construction Co. Inc. &amp; Subsidiary, Wamego, $999,107.14.

106 KA 6256-01: Signage upgrade in Thomas County on K-25, K-184, US 24 from I-70 to US 83, and US 83 from US 24 to the Thomas/Sheridan County Line. KOMO Construction LLC/DBA A&amp;H Co., Elko New Market, Minnesota, $211,905.07.

106 KA 6257-01: Signage upgrade (mainly) in Graham County on US 24, US 283, K-18, K-84, and K-85. KOMO/A&amp;H, $293,720.29.

106 KA 6111-01: Signage upgrade in Greenwood County on US 54, US 400, K-58, K-99, and K-249. KOMO/A&amp;H, $637,033.96.

135-40 KA 6284-01: Lighting upgrade on I-135 at Lincoln Blvd in Hesston. Atlas Electric, $221,450.00.

55-96 KA 3887-01: Replace the K-55 bridge over the Arkansas River. Detour via US 81, K-53, and K-15. A M Cohron &amp; Son Inc., Atlantic, Iowa, $8,227,018.62

96-102 KA 3274-01: Reconstruction of Broadway (K-96) in Leoti as a three-lane road with Angled parking on both sides.

Federal-Aid, Local Projects:

75 TE 0501-01: Pedestrian trail along Green Valley Road between Manhattan and St. George. Ebert, $999,015.91.

21 C 5079-01: Replace a bridge over Holland Creek just north of Carlton. Reece Construction Company, Inc., Salina, $802,484.49.

Non-FA:

435-46 KA 6400-01: Pavement patching on I-435 between Antioch and State Line. Clarkson, $5,119,813.10.

177-106 KA 5581-01: Fiber run along K-177 between I-70 and Manhattan. Wildcat Construction Co. Inc. &amp; Subsidiaries, Wichita, $1,823,313.25

106 KA 6491-01: Pedestrian Ramp improvements in Grainfield and Dighton. Multicon Inc., Wichita, $140,272.20.

106 KA 6494-01: Pedestrian Ramp improvements in Centralia, Fairview, Winchester, Pomona, and La Cygne. Multicon, $75,513.50.
Peace to you, and... don't drive like my brother.

R.P.K.



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.