I was on a more thorough inspection of the CAP website; specifically the 30 Crossing page and this is what I found: “Project Updates
Draft Environmental Assessment
Progress continues in preparing the draft Environmental Assessment. The following documents will be included in this report and will be made available for public review prior to the next public hearing. A public hearing is currently anticipated for late 2017 or early 2018.
Indirect Effects Technical Report
PEL Traffic and Safety Report
Alternatives Technical Report
PEL Public Involvement Summary
EA Public Involvement Summary
Community Impacts Technical Report
Phase I Cultural Resources Survey
Section 4(f) Evaluations
Noise Study
Utility Technical Memorandum
Visual and Aesthetics Technical Report
Hazardous Materials Report
Streams and Wetlands Report
Water Quality Technical Memorandum
Floodplain Technical Memorandum
MSAT Analysis report
Cumulative Effects Technical Report
Draft Interchange Justification Report (IJR)
Modifications to entrance and exit ramps throughout the corridor are proposed as part of the 30 Crossing project. To address these changes, an Interchange Justification Report is being prepared to justify the new or revised access points on the interstate. This report includes information on conceptual design, traffic results, safety analysis, and signing plan. This report is currently in progress.
Design-Build Procurement
In May, the Arkansas Department of Transportation (formerly AHTD) issued notice that it was seeking Statements of Qualifications from firms desiring to design and construct the project. The SOQs were due at the end of June, and AHTD is currently reviewing the submittals. A short list of firms is expected in September with a Request for Proposals issued in early 2018.” CAP website-30 Crossing
It looks like things are going to really pick up in early 2018!