OK...so right now
-295 SB goes 2 lanes after the 495 exit until it meets 95
-At the junction it becomes 5 lanes until exit 4B
So with construction it will become...
If I recall correctly from [mention]Alex4897 [/mention] or [mention]Alps [/mention]said it will be 7 or 8 lanes.
iPhone
For a brief moment.
Basically, directly under 141 where 295 has merged into 95, it will be 3 lanes from 95 and 3 lanes from 295.
In the C/D area for 141, there's 1 thru aux lane, and 1 decel/accel lane between the cloverleaf ramps for 141, which will equal 8 lanes total. Also, then there will be 6 lanes on 95, and 1 aux lane, 1 accel lane from 141 South to 95 South.
So there's 8 lanes total at max, but 2 of those lanes are for the 141 ramps, and that condition will last for less than 1/4 mile combined in 2 different places.
As it stands today, there's already 7 lanes in those areas. The only difference in the future will be the 3rd lane from 295 merging in.