Projects you thought would be done by now....

Started by Mergingtraffic, February 15, 2011, 10:35:00 AM

Previous topic - Next topic

Mergingtraffic

I'll start the list:

In CT:  Lots!  I-84 Widening in Waterbury and at select spots in Danbury.
RI: Routes 6&10 interchange
I only take pics of good looking signs. Long live non-reflective button copy!
MergingTraffic https://www.flickr.com/photos/98731835@N05/


agentsteel53

I-15 through Vegas.  Has been under construction every time I've been there since the late 90s.  Okay, half the time it isn't really construction, just an excuse to put up a "fines doubled" speed trap - but still!
live from sunny San Diego.

http://shields.aaroads.com

jake@aaroads.com

Dr Frankenstein

The A-30 extension was supposed to open in the early 90s after already being years late on the initial project. Now it's planned to open in December 2012...

hbelkins

Government would be tolerable if not for politicians and bureaucrats.

agentsteel53

live from sunny San Diego.

http://shields.aaroads.com

jake@aaroads.com

Henry

Go Cubs Go! Go Cubs Go! Hey Chicago, what do you say? The Cubs are gonna win today!

triplemultiplex

In Madison, the Beltline interchange with Verona Rd which has had a study going on for at least as long as I've been aware that WisDOT had a website.  So that's at least '98.
"That's just like... your opinion, man."

Quillz


FreewayDan

The Hardy Toll Road extension to downtown Houston and the northeast section of the Sam Houston Tollway.
LEFT ON GREEN
ARROW ONLY

Duke87

Whatever the hell PennDOT has been doing to I-80 for the past decade that requires them to force a single lane for 10 miles at a time repeatedly.
If you always take the same road, you will never see anything new.

kharvey10

Upgrading I-270 from Lilac to 255 (if IDiOT would just get off their lazy butts and do it)


mightyace

Making I-65 at least six lanes all the way from Saturn Parkway (Exit 53) to the Kentucky border (MP 120~121).  (Current 6 lane is Exit 65-97 with construction just getting underway for exit 59-65).

The three miles of US 220 (Future I-99) between I-80's Exit 178 and the south end of the 220 freeway near Salona.

A connection between the north end of the Selinsgrove, PA bypass (US 11-15) and the south end of PA 147 freeway.

And, let me be the first to say it, BREEZEWOOD!  I would have thought there would be a freeway-freeway connection for I-70 by now and every other place where a freeway crosses the PA Turnpike without an exit!
My Flickr Photos: http://www.flickr.com/photos/mightyace

I'm out of this F***KING PLACE!

OracleUsr

US 70 between Statesville and Cleveland.  They've been working on that for a year or more and are still nowhere near ready.

Also, even longer, Mebane St. in Burlington.  Even longer running project.
Anti-center-tabbing, anti-sequential-numbering, anti-Clearview BGS FAN

Alps

NJ 3/US 46 interchange rebuild (keeps getting pushed back by 4 years every 4 years)
Second Pulaski Skyway - whether it involves keeping or replacing the existing one
All Electronic Tolling anywhere in this country as a retrofit to an existing toll road (coming soon to I-78 entering PA? I-95 entering NY? define soon?)
CT 11, the number of times it's been proposed
Autoroute 35 extension, at least it's underway

cjk374

You mean I get the honor and privilege of saying......I-49 NORTH of Shreveport?   :pan:
Runnin' roads and polishin' rails.

national highway 1

Reopening the northern bit of CA 39 in the San Gabriel Mountains.
I-710 between Valley Blvd & California Blvd, Pasadena.
"Set up road signs; put up guideposts. Take note of the highway, the road that you take." Jeremiah 31:21

jdb1234


Alex

They built an artificial hill within one of the cloverleaf ramps at Interstate 95 and Delaware 1 & 7 in 1992 to be used for an eventual flyover ramp. While ground is expected to be broken soon almost 20 years later, the interchange upgrade should have been completed a long time ago...

myosh_tino

Quote from: Quillz on February 15, 2011, 05:15:03 PM
I-210 and I-905
Isn't the I-210/CA-210 freeway fully constructed and open to traffic along it's entire length between I-5 and I-10?
Quote from: golden eagle
If I owned a dam and decided to donate it to charity, would I be giving a dam? I'm sure that might be a first because no one really gives a dam.

TheStranger

Quote from: myosh_tino on February 16, 2011, 02:44:03 AM
Quote from: Quillz on February 15, 2011, 05:15:03 PM
I-210 and I-905
Isn't the I-210/CA-210 freeway fully constructed and open to traffic along it's entire length between I-5 and I-10?

I think so, with the only work remaining being the 210/215 interchange.  The old Route 30 freeway east of I-215 is now signed as Route 210.
Chris Sampang

agentsteel53

Quote from: TheStranger on February 16, 2011, 03:28:44 AM

I think so, with the only work remaining being the 210/215 interchange.  The old Route 30 freeway east of I-215 is now signed as Route 210.

that is correct.  Just drove through the 210-215 interchange yesterday on 215, and a few weeks ago on 210.  If one road deserves to not be signed as an interstate... it's 215!  Southbound, I counted seven abrupt lane shifts (like, 75 feet, pay attention or eat some Jersey barrier) in the span of a mile.
live from sunny San Diego.

http://shields.aaroads.com

jake@aaroads.com

brownpelican

* Widening I-10 from six to eight lanes from Clearview Pkwy to Williams Blvd. in Jefferson Parish.
* Westbank Expressway (Bus. U.S. 90) interchange at Peters Road (should have been done last decade)
*Revamp of I-10/I-110 interchange in Baton Rouge. How can LADOTD NOT think that's a problem?

Mr_Northside

Quote from: mightyace on February 15, 2011, 09:12:51 PM
The three miles of US 220 (Future I-99) between I-80's Exit 178 and the south end of the 220 freeway near Salona.

And, let me be the first to say it, BREEZEWOOD!  I would have thought there would be a freeway-freeway connection for I-70 by now and every other place where a freeway crosses the PA Turnpike without an exit!

I guess this helps illustrate the difference between "should" and "would".

These 2 examples are projects I thought should be done by now.  (And lord knows how many others could be added to THAT list...)

But, and maybe I'm just starting to get old and crotchety here, I really have/had no expectations these would be done by now.
I don't have opinions anymore. All I know is that no one is better than anyone else, and everyone is the best at everything

Stephane Dumas

Quote from: Dr Frankenstein on February 15, 2011, 11:09:47 AM
The A-30 extension was supposed to open in the early 90s after already being years late on the initial project. Now it's planned to open in December 2012...

Add also to the list, the missing gap of A-25 and the A-73 extension as well as the proposed A-20 gap between Cacouna and Rimouski.

Bickendan

The Westside Bypass, from Wilsonville or Tualatin at I-5 to Aloha or Hillsboro at US 26.
A freeway to freeway connection from BC 99 to the TCH in metro Vancouver.
The western two miles of I-90.