State Route 210 West

Replaced guide sign for the trumpet interchange joining Golf Links Road west with Aviation Parkway
07/26/08
The interchange joining Golf Links Road with Barraza-Aviation Parkway was constructed along with the extension of Golf Links Road in the early 1980s by the City of Tucson.
04/26/17
Traffic partitions with three lanes continuing south along Golf Links Road to Alvernon Way south and a two lane exit for Aviation Parkway west to Alvernon Way north.
04/26/17
The entrance ramp to Aviation Parkway west from Golf Links Road south partitions with an exit to Alvernon Way.
04/26/17

Aviation Parkway curves northwest alongside the Union Pacific Railroad beyond the intersection with Dodge Boulevard north.
04/26/17
Palo Verde Road spans Aviation Parkway, the UP Railroad and E 36th Street along a decorative viaduct.
04/26/17
Richey Boulevard links SR 210 (Aviation Parkway) with Palo Verde Road via a separate section of Golf Links Road.
04/26/17
E 34th Street ties into SR 210 (Aviation Parkway) at a signalized intersection south of the Julia Keen neighborhood.
04/26/17
Country Club Road heads north from a signalized intersection with Aviation Parkway to the Barrio Centro and Arroyo Chico neighborhoods and Gene C. Reid Park.
04/26/17
Exit 4 departs Aviation Parkway west for 22nd Street eastbound at the Arroyo Chico neighborhood.
04/26/17
The limited access section of the expressway along SR 210 begins just beyond the traffic light for 22nd Street east.
04/26/17
The entrance ramp from 22nd Street west adds an auxiliary lane along SR 210 (Aviation Parkway) west to Exit 3 for Kino Parkway.
04/26/17
Kino Parkway is a controlled access arterial stretching 3.53 miles overall from Broadway Boulevard at Campbell Avenue southward to I-10 at the continuation of Campbell Avenue. The arterial was built instead of the proposal for I-710.
04/26/17
SR 210 continues 0.75 miles from Kino Parkway to the half built SPUI (Exit 2) with Broadway Boulevard.
04/26/17
SR 210 passes between the Millville and Barrio San Antonio neighborhoods ahead of the Park Avenue underpass. The Aviation Bikeway spans Park Avenue along the north side of SR 210 here.
04/26/17
SR 210 (Barraza-Aviation Parkway) concludes at Broadway Boulevard by the Iron Horse neighborhood.
04/26/17
Construction underway through mid-2023 extends Barraza-Aviation Parkway along an at-grade route northwest from Broadway Boulevard to 6th Avenue.
04/26/17
Photo Credits:
- Kevin Trinkle: 07/26/08
- ABRoads: 04/26/17