Champlain Parkway

Champlain Parkway is an at-grade roadway extending northwest from the exchange joining the west end of Interstate 189 with U.S. 7 (Shelburne Road) along the South Burlington city line to Lakeside Avenue in Burlington. The parkway was constructed in place of cancelled plans for the Burlington Belt Line, an expressway proposed in the 1965 Greater Burlington Urban Area Highway Plan. Then referred to as the Southern Connector, the initial roadways for Champlain Parkway were built in the 1980s between U.S. 7 and Home Avenue. However, this connection never opened to traffic and sat unused to 2026.

Champlain Parkway was constructed north from Home Avenue to Lakeside Avenue with two lanes and a parallel multi use path. Work got underway in Summer 2022 and was completed in December 2024. Construction on the unused roadways connecting Home Avenue with I-189 started in January 2025. Completion of this work is expected in Summer 2026.