


The first shield for SR 82 east stands just beyond U.S. 41 (Cleveland Avenue) beside the Lee County Justice Center Complex.
05/19/19

U.S. 41 Business is discontinuous from SR 80 in Downtown Fort Myers and SR 739 north along Evans Avenue.
11/29/19

SR 739 emerges from U.S. 41 Business south along Fowler Street en route to Metro Parkway and San Carlos Park.
11/29/19

SR 739 and U.S. 41 Business combine across the Edison Bridge over the Caloosahatchee River into North Fort Myers.
11/29/19

SR 80 begins along 2nd Street from U.S. 41 Business (Evans Avenue) six blocks north of SR 82.
11/29/19

CR 865 extends north to SR 80 (Palm Beach Boulevard) at Tice and south to SR 739 (Metro Parkway), where SR 865 takes over.
11/29/19

Buc-ee's, a 120-pump service station, will be constructed along the south side of SR 82 between Ortiz Avenue and I-75.
11/29/19

Heading north across the Calooshatchee River, I-75 continues to Punta Gorda, Sarasota, Bradenton and Tampa-St. Petersburg.
11/29/19

CR 884 (Colonial Boulevard) comprises a major arterial route across the Fort Myers area west to Cape Coral and east into Lehigh Acres.
11/29/19

CR 884 (Colonial Boulevard) leads west back to Forum Boulevard, where it upgrades to SR 884 through the exchange with I-75.
11/29/19

County Road 884 travels west across the Midpoint Bridge onto Veterans Parkway through Cape Coral and east along Lee and Joel Boulevards to SR 80 near Alva.
11/29/19

The approaching continuous flow intersection (CFI) joining SR 82 with Daniels Parkway (CR 876) west and Gunnery Road north was the first built within the state of Florida.
11/29/19

Turning traffic from SR 82 east to Gunnery Road (CR 876) north into Lehigh Acres separates ahead of the signal with Daniels Parkway.
11/29/19

The right turn for Daniels Parkway west to Southwest Florida International Airport (RSW) follows from SR 82 eastbound.
11/29/19

Signals operate for the left turns preceding Daniels Parkway from both directions of SR 82. The CFI eliminates one of the signal phases at the main intersection.
11/29/19

A third signal operates where traffic from SR 82 westbound separates for Daniels Parkway (CR 876). A protected signal also operates along the turn lane from Daniels Parkway east to SR 82 east.
11/29/19

Leading away from the CFI with Daniels Parkway / Gunnery Road, six lane expansion for SR 82 east to the Hendry County line runs through the end of 2020.
11/29/19

The 1.27 mile stretch of SR 82 through Henry County was widened to four lanes during a $7.6 million project completed by the end of 2016.1
11/29/19

Entering Collier County, SR 82 narrows back to two lanes. $29 million in construction four lanes the easternmost 3.2 mile section leading to SR 29 between October 2019 and Summer 2022.
11/29/19
Sources:
- SR 82 Widening from the Lee/Hendry County Line to the Hendry/Collier County Line. Florida Department of Transportation (FDOT), District 1 web page.
Photo Credits:
05/19/19, 11/29/19 by AARoads
Connect with:
Interstate 75
U.S. 41 Business - Fort Myers / North Fort Myers
State Road 29 / County Road 29
State Road 739
State Road 865 / Lee County Road 865
State Road 884 / Lee County Road 884
Page Updated 12-02-2019.