Business Loop I-25 - Cheyenne




Through Cheyenne, Business Loop I-25 follows College Drive (Wyoming 212) and Central / Warren Avenues (U.S. 85). The route is cosigned in its entirety with U.S. 87 Business, and partially with Interstate 180.

| Signed Route | Milepost Number | Description | State Control Route | Distance | Overall Mileage |
|---|---|---|---|---|---|
![]() |
0.00 | Junction ; Begin ![]() |
SH 212 | 0.00 | 0.00 |
| 0.66 | Railroad at-grade crossing | SH 212 | 0.66 | 0.66 | |
![]() |
2.71/7.31 | Junction ![]() splits to east |
SH 212/25 | 2.05 | 2.71 |
| 8.34 | Junction East; Begin Divided Section |
25 | 1.03 | 3.74 | |
Bus ![]() |
8.50 | Junction ![]() BEGIN ![]() |
25 | 0.16 | 3.90 |
| 8.51 | South City Limits Cheyenne | 25 | 0.01 | 3.91 | |
| 8.67 | Deming Drive Separation | 25 | 0.16 | 4.07 | |
| 8.98 | Pedestrian Overpass | 25 | 0.31 | 4.38 | |
| 9.37 | Union Pacific Railroad Separation | 25 | 0.39 | 4.77 | |
| 9.60 | 9.60BK=9.74AH | 25 | 0.23 | 5.00 | |
![]() |
9.74 | Junction (Lincolnway) |
25 | 0.00 | 5.00 |
| 9.74 | Split into Central Ave SB and Warren Ave NB | 25 | 0.00 | 5.00 | |
| 9.74 | END ![]() |
25 | 0.00 | 5.00 | |
| 10.76 | 10.76BK=10.80AH | 25 | 1.02 | 6.02 | |
| 10.80 | Rejoin Central Ave SB and Warren Ave NB | 25 | 0.00 | 6.02 | |
| 11.49 | 11.49BK=11.40AH | 25 | 0.69 | 6.71 | |
| 11.79 | Junction North |
25 | 0.39 | 7.10 | |
| 12.61 | Junction (MP 12.70) |
25 | 0.82 | 7.92 | |
| 12.61 | Junction WestEND Bus ![]() |
25 | 0.00 | 7.92 |
Connect with:
Page Updated Thursday January 18, 2018.




; Begin
East; Begin Divided Section

(Lincolnway)
North
West