Interstate 140 East




Signs reference Pellissippi Parkway as a part of Interstate 140 leading south from the folded diamond interchange with Dutchtown Road.
01/16/19
01/16/19

The first confirming marker for Interstate 140 east precedes the directional cloverleaf interchange with I-40/75.
01/16/19
01/16/19

Interstate 140 proceeds south from I-40/75 to a cloverleaf interchange (Exit 1) with U.S. 11/70 (Kingston Pike).
01/16/19
01/16/19

U.S. 11/70 (Kingston Pike) constitutes a commercial arterial west from Exit 1B to the town of Farragut.
01/16/19
01/16/19

U.S. 11/70 (Kingston Pike) parallel I-40/75 just to the south along a commercialized stretch to West Town Mall in Knoxville.
01/16/19
01/16/19

I-140 crosses an arm of Fort Loudoun Lake ahead of the diamond interchange (Exit 3) with Westland Drive.
01/16/19
01/16/19

SR 332 (Northshore Drive) meanders east from Concord and Fort Loudoun to meet Interstate 140 at Exit 5.
01/16/19
01/16/19

Exit 5 consists of a distributor roadway with ramps to both adjacent Town Center Boulevard and SR 332 (Northshore Drive).
01/16/19
01/16/19

An S-curve leads Interstate 140 south to the bridge across Fort Loudoun Lake and Exit 9 for SR 333 (Topside Road).
01/16/19
01/16/19

SR 333 (Topside Road) meets Interstate 140 at a diamond interchange (Exit 9) in north Alcoa.
01/16/19
01/16/19

A cloverleaf interchange joins I-140/SR 162 (Pellissippi Parkway) with U.S. 129 (Alcoa Highway) at Exit 11.
01/16/19
01/16/19

Construction of a new freeway alignment for U.S. 129/SR 115 (Alcoa Highway) will all but remove the exchange at Exit 11. Only the southbound ramp at Exit 11A will remain.
01/16/19
01/16/19

U.S. 129 will bypass the arterial stretch leading south to McGhee Tyson Airport along a freeway to SR 35. A new exchange will be built with SR 162 further south.
01/16/19
01/16/19

Interstate 140 ends at U.S. 129. SR 162 extends Pellissippi Parkway southeast another 2.54 miles to SR 33.
01/16/19
01/16/19


A half diamond interchange connects SR 162 (Pellissippi Parkway) with Cusick Road. These ramps will be removed during construction of the cloverstack interchange with the relocated U.S. 129.
01/16/19
01/16/19

Pellissippi Parkway concludes 1.25 miles south of the Norfolk Southern Railroad / Grade Road underpass.
01/16/19
01/16/19

SR 33 (Old Knoxville Highway) continues south from SR 162 onto Broadway Avenue through Eagleton Village and the city of Maryville.
01/16/19
01/16/19