


CR 541 (Mount Holly Road) links Interstate 295 with the New Jersey Turnpike at Exit 5 in Westampton Township.
12/27/18

CR 541 (Mount Holly Road) heads north from the cloverleaf interchange at Exit 47 to U.S. 130 in the city of Burlington.
12/27/18

CR 541 angles southeast to Mount Holly, where the route shifts onto an arterial bypass to the west of the township center.
12/27/18

Interstate 295 advances south from Burlington Township into Westampton Township ahead of the cloverleaf interchange (Exit 45) with Rancocas Road (CR 620).
12/27/18

Rancocas Road (CR 626) becomes Beverly Rancocas Road northwest to U.S. 130 through Willingboro Township.
12/27/18

Route 38 converges with Interstate 295 west from Mount Holly at Exit 40 in Mount Laurel Township.
12/27/18

The three quarter cloverleaf interchange at Exit 40 connects I-295 south only with Route 38 westbound to Moorestown.
12/27/18

Route 38 extends west to Maple Grove, Cherry Hill and U.S. 30/130 just outside the city of Camden.
12/27/18

Right in right out (RIRO) ramps at Exit 36 B link I-295 southbound with Nixon Drive at Moorestown Mall. Nixon Drive west to Collins Road connects with Route 73 north to the Tacony-Palmyra Bridge spanning the Delaware River.
12/27/18

Route 73 runs north through Maple Shade and Cinnaminson Township to the borough of Palmyra. PA 73 continues the route to Tacony in Philadelphia.
12/27/18

Route 73 meets the New Jersey Turnpike at Exit 4 in Mount Laurel Township south en route to U.S. 30 at the borough of Berlin.
12/27/18

Interstate 295 and Route 70 come together at a cloverleaf interchange (Exit 34) in Cherry Hill Township.
12/27/18

A six-ramp parclo interchange connects I-295 south with CR 561 (Haddonfield-Berlin Road) at Exit 32 in west Cherry Hill Township.
12/27/18

The I-295 Direct Connect project underway from 2013 to 2028 reconstructs the exchange joining I-295, I-76 and Route 42 (North South Freeway) to eliminate weaving traffic and substandard ramps.
12/18/16

Completed in 2021, a five lane tunnel was constructed below the future realignment of the I-295 mainline by New Saint Mary's Tunnel.
12/18/16

The substandard ramp taking the I-295 southbound mainline onto the east end of Interstate 76 will be eliminated as part of the I-295 Direct Connect project.
12/18/16

The southbound roadway for I-295 runs alongside I-76 east ahead of Route 42 (North South Freeway).
12/18/16

Route 42 follows the North South Freeway south from Bellmawr to the Atlantic City Expressway at Turnersville and Washington Township.
12/18/16

Measuring 14.28 miles in length, Route 42 extends south to U.S. 322 in Monroe Township. The Atlantic City Expressway travels 44.19 miles from Turnersville to Atlantic City by the Convention Center.
12/18/16

Confirming marker posted beyond the Essex Avenue underpass. Construction underway to late 2023 added ramps linking Route 42 north with I-295 south and I-295 north with Route 42 south.
12/18/16
Photo Credits:
- 12/18/16 by AARoads and Carter Buchanan. 12/27/18 by AARoads.
Connect with:
Interstate 76
Route 42 - North South Freeway
Route 73
Page Updated 11-21-2022.