Interstate 585 North






U.S. 176/S.C. 9 (N Pine Street) continue north from Main Street (old U.S. 29) through an S-curve at U.S. 29 (St. John Street).
06/01/07
06/01/07

U.S. 29 follows St. John Street east back to Main Street by adjacent Converse College and west across Downtown Spartanburg to Main Street at S.C. 296 (John B. White, Sr. Boulevard).
06/01/07
06/01/07

Business Spur I-585 previously began along U.S. 176/S.C. 9 (N Pine Street) north from U.S. 29 (St. John Street).
06/01/07
06/01/07

Daniel Morgan Avenue stems west from U.S. 176/S.C. 9 (N Pine Street) as the former eastern extent of S.C. 296 through Downtown Spartanburg.
06/01/07
06/01/07

Linder Street ties into the intersection joining U.S. 176/S.C. 9 (N Pine Street) with Daniel Morgan Avenue (old S.C. 296) west.
06/01/07
06/01/07

Continuing north from Daniel Morgan Avenue, U.S. 176/S.C. 9 pass under a Norfolk Southern Railroad viaduct.
12/15/16
12/15/16

Cleveland Street (Road 70) intersects N Pine Street beyond the NS Railroad bridge east from Wofford College.
05/25/21
05/25/21

A reassurance marker for I-585/U.S. 176-S.C. 9 previously stood along N Pine Street at Cleveland Street.
06/01/07
06/01/07

Isom Street (Road 44) extends 0.54 miles west from Drayton Road and the Beaumont Village community to U.S. 176/S.C. 9 (N Pine Street).
05/25/21
05/25/21

Garner Road angles southwest from Beaumont Avenue along a commercial strip to U.S. 176/S.C. 9 across from Twitty Street to Gibbs Stadium at Wofford College.
05/25/21
05/25/21

U.S. 176 Connector branches west from N Pine Street 0.52 miles along Wood Street to Spartanburg Medical Center and U.S. 221 (Church Street).
05/25/21
05/25/21

The first shield for Interstate 585 appears along N Pine Street between Garner Road and Wood Street (U.S. 176 Connector).
08/03/13
08/03/13

The last traffic light along U.S. 176/S.C. 9 (N Pine Street) west is with Pearl Street west and McCravy Drive east by Pinewood Shopping Center.
05/25/21
05/25/21

U.S. 176/S.C. 9 (N Pine Street) advance north alongside Pinewood Shopping Center to succeeding diamond interchanges with U.S. 221 (Whitney Road) at Exit 25B and the split with S.C. 9 (Boiling Springs Road) at Exit 25A.
05/25/21
05/25/21




U.S. 176/S.C. 9 (N Pine Street) advance north alongside Pinewood Shopping Center to succeeding diamond interchanges with U.S. 221 (Whitney Road) at Exit 25B and the split with S.C. 9 (Boiling Springs Road) at Exit 25A.
05/25/21
05/25/21

Exit 25B leaves I-585/U.S. 176-S.C. 9 north for U.S. 221 (Whitney Road). U.S. 221 heads 14 miles northeast through Whitney and Cherokee Springs to Chesnee.
05/25/21
05/25/21

S.C. 9 parts ways with I-585/U.S. 176 (N Pine Street) for Boiling Springs Road north from Exit 25A and Church Street (U.S. 176 Connector). The multi state route leaves Spartanburg for Boiling Springs, New Prospect and Mill Spring, North Carolina.
05/25/21
05/25/21

Exit 25A leaves I-585/U.S. 176 west for S.C. 9 north and Church Street (U.S. 176 Connector) south 0.36 miles to U.S. 221 (Whitney Road) at Spartanburg.
06/01/07
06/01/07

Confirming markers for I-585 north and U.S. 176 west stand below the Church Street (U.S. 176 Connector/S.C. 9) overpass.
05/25/21
05/25/21

Advancing northward, I-585/U.S. 176 (N Pine Street) meet California Avenue (Road 124) at a split diamond interchange (Exit 24).
05/25/21
05/25/21



Construction realigned the off-ramp to California Avenue in 2015. This guide sign was removed during the road work.
06/01/07
06/01/07

California Avenue east leads 0.32 miles to S.C. 9 (Boiling Springs Road) and west to 0.65 miles to S.C. 56 (Asheville Highway). California Avenue extends southwest along Road 96 to New Cut Road and Una.
12/15/16
12/15/16

The California Avenue overpass was struck by a truck hauling a crane in January 2014. The bridge was dislocated by five feet, leading to its demolition and ultimate replacement. A 12 month long project resulted in a new decorative span that opened in March 2015.
12/15/16
12/15/16

A frontage road system accompanies I-585/U.S. 176 (N Pine Street) alongside Milliken Arboretum to the three quarter cloverleaf interchange (Exits 23B/A) with Business Loop I-85.
05/25/21
05/25/21

Exit 23B departs I-585/U.S. 176 west immediately after an on-ramp from adjacent Milliken Road. Business Loop I-85 connects with I-85 north to Gaffney and Charlotte, North Carolina in 4.03 miles.
05/25/21
05/25/21

2003-06 construction rebuilt the northern half of the cloverleaf with Business Loop I-85 to improve ramp geometry. Previously marked as Exit 23B, the ramp for Business Loop I-85 north joins the freeway just ahead of a turn off (Exit 5B) for adjacent Milliken Road.
05/25/21
05/25/21

The loop ramp for Business Loop I-85 south to Greer and Greenville leaves I-585/U.S. 176 north. The adjacent exchange with E Campus Boulevard to USC Upstate opened in 2006.
05/25/21
05/25/21

The exit to E Campus Boulevard departs below the entrance ramp joining Business Loop I-85 south with I-585/U.S. 176 north. Improving access to the adjacent USC Upstate campus, E Campus Boulevard was built in conjunction with work upgrading U.S. 176 to limited access standards.
05/25/21
05/25/21

A diamond interchange follows with Valley Falls Road (Road 79) south to Lone Oak and north to Valley Springs.
05/25/21
05/25/21

This reassurance marker for Interstate 585 north precedes the Valley Falls Road overpass. A loop ramp previously departed here for Valley Falls Road. It was replaced during the I-585 expansion project.
05/25/21
05/25/21

This reassurance marker for Interstate 585 north precedes the Valley Falls Road overpass. A loop ramp previously departed here for Valley Falls Road. It was replaced during the I-585 expansion project.
06/01/07
06/01/07

A second shield for Interstate 585 north was added after the Valley Falls Road entrance ramp. U.S. 176 transitions into an at-grade divided highway.
05/25/21
05/25/21

The right lane of U.S. 176 west defaults onto I-85 north at the forthcoming diamond interchange while a left turn connects with the southbound entrance ramp toward Greenville.
05/25/21
05/25/21
Photo Credits:
- Andy Field, Carter Buchanan: 06/01/07
- Alex Nitzman: 12/15/16
- Brent Ivy: 05/25/21
- Carter Buchanan: 08/03/13
- Andy Field: 06/01/07
Page Updated Monday June 21, 2021.