U.S. 13 South



Pine Grove Road (SR 2071) heads south from Lower Makefield township and Trenton Avenue outside Morrisville to a cloverleaf interchange joining the north end of U.S. 13 with U.S. 1.
10/03/04
10/03/04

Trenton Avenue (SR 2026) previously linked Pine Grove Road with U.S. 1 south to Langhorne. U.S. 13 meets U.S. 1 north directly.
12/19/17
12/19/17

A loop ramp provides access to U.S. 1 northbound to Morrisville and the Trenton Morrisville Toll Bridge across the Delaware River into New Jersey.
12/19/17
12/19/17

A begin shield for U.S. 13 stands within the exchange for the freeway along U.S. 1 in Falls township.
12/19/17
12/19/17

U.S. 13 spans Norfolk Southern and Penn Central Railroad lines leading into a folded diamond interchange with Lower Morrisville Road (SR 2109) west and Newbold Road east.
12/19/17
12/19/17

Lower Morrisville Road heads southwest to Fallsington. Newbold Road extends the road southeast to New Tyburn Road and Old Bristol Pike into Penn Valley.
12/19/17
12/19/17

Tyburn Road arcs northwest from U.S. 13 to Fallsington and U.S. 1 Business (Lincoln Highway). New Tyburn Road (SR 2020) comprises an expressway east to Pennsylvania Avenue.
12/19/17
12/19/17

Entering the cloverleaf interchange with New Tyburn Road (SR 2020) on U.S. 13 (Bristol Pike) south.
12/19/17
12/19/17

U.S. 13 (Bristol Pike) south of the access road connecting with Interstate 95 along the Pennsylvania Turnpike in Bristol township.
12/27/18
12/27/18

Beaver Dam Road heads south to become Beaver Street into the borough of Bristol at U.S. 13 (Bristol Pike).
12/27/18
12/27/18

U.S. 13 (Bristol Pike) meets PA 413 (Veterans Highway) south to the Burlington-Bristol Bridge spanning the Delaware River at a jughandle intersection just outside Bristol.
03/23/04
03/23/04
Photo Credits:
- Alex Nitzman: 03/23/04, 10/03/04, 12/27/18
- ABRoads: 12/19/17
- AARoads: 07/27/07
Page Updated Wednesday July 14, 2021.