U.S. 220 North - Williamsport



U.S. 220 runs along the south side of a residential street grid east from Linden to the split with Fourth Street (old U.S. 220) into Williamsport.
05/07/05
05/07/05

Fourth Street (SR 2014) branches east from U.S. 220 as a four lane arterial to the industrial west side of Williamsport.
05/07/05
05/07/05

Reach Road east connects with Arch Street (SR 2064) south to Hiawatha along the Susquehanna River West Branch.
05/07/05
05/07/05

U.S. 220 continues east to a modified trumpet interchange with U.S. 15 / Future I-99 north to Mansfield and Painted Post, New York.
05/07/05
05/07/05

The Susquehanna Beltway advances east toward Maynard Street and Downtown Williamsport as I-180, U.S. 15 and U.S. 220.
05/07/05
05/07/05
Photo Credits:
- Alex Nitzman: 05/07/05
Page Updated Saturday January 30, 2021.