Interstate 189 Vermont
Overview
Interstate 189 is the lone branch route for I-89. The freeway spur connects U.S. 7 (Shelburne Road) with Interstate 89, Dorsett Street and Kennedy Drive north to Burlington International Airport (BTV).
History
The Vermont Department of Highways initially suggested to the American Association of State Highway Officials (AASHO) on April 15, 1958 that the spur into Burlington be numbered SP 89. A map sent to AASHO showed a spur drawn west from I-89 near Patchen Road west to U.S. 2/7 (Riverside Avenue) near the Winooski River. A subsequent letter to AASHO on April 18, 1958 suggested that the spur be unnumbered:
For route numbering purposes, so far as motorists are concerned, we do not think it should have a separate number. Traffic destined for the interstate should be guided by trail blazer assemblies, while traffic leaving the interstate would follow guide signs into the city. We realize, of course, that a somewhat different situation would exist in connection with loops and through routes.
Per instructions from AASHO, Vermont submitted Interstate 189 as the proposed numbering on August 29, 1958. AASHO approved it on November 10, 1958.
Interstate 189 opened to traffic from I-89 west to U.S. 7 on November 29, 1962. The freeway was originally planned to connect with the Burlington Belt Line Highway as part of the 1965 Greater Burlington Urban Area Highway Plan. Serving industrial areas and Downtown Burlington, the Belt Line was proposed south from Burlington to U.S. 7 and north along the Lake Champlain waterfront. Northern reaches of the expressway extended along Winooksi Valley Parkway (Vermont 127) toward the Colchester town line. Despite right of way acquisition already made, plans for the expressway succumbed to adamant neighborhood opposition and a resurgence in the city economy. They were subsequently cancelled.
Route Information
Source: December 31, 2021 Interstate Route Log and Finders List
I-189 Annual Average Daily Traffic (AADT)
Location | Vehicles per day |
---|---|
US 7 to I-89 | 33,927 |
Source: 2019 (Route Log) AADTs – Vermont Agency of Transportation (VTrans)
Southern Connector
The Southern Connector was proposed as a four lane boulevard by a consultant for the city of Burlington in 1974. Generally following the former Belt Line route north from I-189 and U.S. 7 to Pine Street at Flynn Avenue, the Southern Connector also outlined expanding Pine Street north to Pine Place, where it would shift northwest to connect with Battery Street in the Central Business District.1
An Environmental Impact Statement (EIS) was prepared for the Southern Connector starting in 1976. Subsurface geotechnical borings in the vicinity of the Pine Street Barge Canal recorded in the 1977 DEIS revealed soil contaminated with oil along the projected right of way. Coal gasification waste was also recorded during project development. The Pine Street Barge Canal area was subsequently included in the Environnmental Protection Agency (EPA) National Priorities List (NPL) of hazardous waste sites. It was identified as the Pine Street Barge Canal Superfund Site in October 1981.1
The Final EIS (FEIS) for the Southern Connector was completed in July 1979 and approved by the Federal Highway Administration (FHWA). The Selected Alternative included a half mile long segment of roadway (Section C-1). Section C-1 was constructed in the late 1980s northwest from the I-189/U.S. 7 exchange across Pine Street to Home Avenue in the South End neighborhood of Burlington. Work on Section C-2 (Home Avenue to Lakeside Avenue) and C-8 (Lakeside Avenue to Battery Street) never broke ground due to the Pine Street Barge Canal Superfund Site.1
Studies in the late 1980s looked at route alternatives that would bypass the Pine Street Barge Canal Superfund Site. The project was rebranded Champlain Parkway by Burlington City Council in the 1990s. A Supplemental Environmental Impact Statement (SEIS) was conducted by the Vermont Agency of Transportation (VTrans) and FHWA from January 1995 to February 1997. It selected a preferred interim alternative that avoided the superfund site. FHWA issued a Record of Decision (ROD) on the Selected Alternative in August 1997.1
Envisioned to provide traffic relief between the City Center District (CCD) and South Burlington, construction on Champlain Parkway was pushed back from a potential late 2019 start date while a Limited Scope Draft Supplemental Environmental Impact Statement (LS DSEIS) was completed. FHWA eventually issued a Record of Decision (ROD) for the project on January 20, 2022. Burlington City Council approved construction contract award on April 15, 2022. 95% of the funding for the $45 million project is covered by the federal government with another 3% by the state of Vermont. The city covers the rest of the South End Construction Coordination Plan (SECCP).3
The two lane, at-grade roadway will run north from Home Avenue over Batchelder and Briggs Streets to Flynn Avenue, then follow a new terrain alignment to Lakeside Avenue.2 The first phase of construction started in July 2022 and runs to 2024. It makes improvements between Home Avenue and Kilburn Street. Planned for 2025 through 2027, the second phase of the SECCP constructs Champlain Parkway from I-189 to Home Avenue, with upgrades along Pine Street from Kilburn Street to Main Street following.3
 Photo Guides
East End
/ Dorset St and Kennedy Dr – South Burlington, Vermont
East at
South at
North at
West End
– Burlington, Vermont
West at
North at
South at
Sources:
- Champlain Parkway – Project History. City of Burlington, project web site.
- “Champlain Parkway construction could begin this year.” WCAX (Burlington, VT), January 5, 2019.
- “After 35 Years of Project Limbo, Administration Secures Unanimous Council Support to Execute $45 Million Champlain Parkway Construction Contract.” City of Burlington, press release. April 25, 2022.
Page updated March 31, 2023.