SR 451 and Apopka were added to diagrammatic signs for Exit 30 on SR 429 north. 06/29/13
SR 451 and Apopka were added to diagrammatic signs for Exit 30 on SR 429 north. 06/29/13
Expressway ends sign for SR 414 / 429 north. 02/27/16
A quarter mile from the temporary north end of SR 429 at SR 429 Connector Road. 06/29/13
This supplemental sign was removed following completion of SR 453 (Mount Dora Connector) northwest to SR 46 in Lake County. 02/27/17
Roadway stubs for the eventual Wekiva Parkway at the north end of the Apopka Expressway. 06/29/13
The half built SPUI joining SR 414 / 429 with SR 429 Connector Road at Apopka. 06/29/13
The northbound ramp for Wekiva Parkway ties into SR 429 Connector Road here now. 06/29/13
SR 429 Connector east at the partially completed SPUI with SR 414 and 429 south. Wekiva Parkway opened north from this exchange on July 27, 2017. 02/27/16
SR 429 north ended at Kelly Park Road until March 31, 2018. 09/03/17
09/03/17
Wekiva Parkway north at the temporary end at Kelly Park Road. 09/03/17
Following the temporary ramp connecting CR 435 with SR 429 near Mt. Plymouth. 02/27/16
Roadway stub for the next section of Wekiva Parkway leading west to SR 453. 02/27/16
The temporary ramp from CR 435 shifted onto the northbound roadway for SR 429. 02/27/16
Stub for the future SR 429 northbound roadway. 02/27/16
A reassurance shield stood just beyond the temporary connection with CR 435 along Wekiva Parkway Sections 4A/4B. This ramp closed permanently on March 25, 2018. 02/27/16
Wekiva Parkway previously ended at an at-grade intersection with SR 46. 02/27/16
SR 429 opened east from Exit 44 on May 16, 2022. 02/27/16
Entering the future diamond interchange (Exit 44) with CR 46A west on SR 429 north. 03/31/18