SR 429 shield posted on what is now SR 451 south of U.S. 441. 02/18/08
The Western Beltway traveled south by previously undeveloped land toward the CR 437A underpass. 02/18/08
A former mileage sign referenced the Western Beltway destinations of Ocoee and Winter Garden. 02/18/08
A second mileage sign followed the CR 437A underpass on then SR 429 south. 02/18/08
Crossing over CR 437A on the now-removed alignment of SR 429 south. 02/18/08
This shield followed the on-ramp joining the old alignment of SR 429 south from CR 437A. 02/18/08
All Highway Gothic font based signs on SR 429 south from Exit 26 to Florida's Turnpike were replaced by 2016 to use Clearview font. 06/29/13
One mile north of Exit 26 on SR 429 south. 06/29/13
With Clarcona-Ocoee Road extended to meet SR 429 directly, signs for Exit 26 were redesigned to drop the word TO. 06/29/13
Replaced sign for CR 437A via West Road from Exit 26. 06/29/13
SR 429 south at what was just West Road. 06/29/13
Southbound one mile ahead of Exit 24 with SR 438. 06/29/13
These signs predated the December 2002 opening of SR 429 south to Florida's Turnpike. 06/29/13
Exit 24 departed from SR 429 south for Ocoee. 06/29/13
A half mile north of SR 50 (Colonial Drive). 06/29/13
Supplemental sign for Florida's Turnpike south to SR 408. 06/29/13
Florida 429 south at Exit 23. 06/29/13
06/29/13
06/29/13
06/29/13
All signs preceding Exit 19 along SR 429 south were carbon copied to use Clearview font, including this mileage sign with a blank space for a third control point. 06/29/13
06/29/13
06/29/13
06/29/13
06/29/13
Until December 2005, SR 429 ended at CR 535 (Winter Garden Vineland Road). 12/19/03
Looking at the temporary end of SR 429 at CR 535 (Winter Garden Vineland Road). 12/19/03
09/02/19
09/02/19
09/02/19
09/02/19
09/02/19
09/02/19
The previously rural stretch of SR 429 to the east of Hickory Nut Lake. 07/04/08
Development added between SR 429 and Hickory Nut Lake includes the Hawksmoor and Waterleigh developments. 03/31/18
Construction nearing completion for Exit 8 to Western Way. 12/29/05
SR 429 southbound during the construction of the Orange Lake area main line toll plaza 12/29/05
12/29/05
The Beltway temporary end at U.S. 192 / Exit 6. 12/29/05
Barricades forced all drivers onto the off-ramp for U.S. 192. The ensuing section opened a year later. 12/29/05