Crossing over Havana Road, 1.25 miles ahead of Exit 191. 11/25/07
A previous six-lane project concluded southbound at River Road (Exit 191). 07/02/11
Heading east into North Port during initial stages of widening between Exits 191 and 182. 04/05/14
1.25 miles out from Exit 182 with Sumter Boulevard. 04/05/14
Overlays added CR 771 for Exit 191 after 2006. However CR 771 was unmarked off the freeway. 04/05/14
Exit 182 departs I-75 south after Big Slough. 04/05/14
I-75 south at Sumter Blvd in North Port prior to six lane expansion. 04/05/14
04/05/14
04/05/14
Southbound I-75 with just two lanes at Kings Highway (Exit 170). 04/05/14
04/05/14
04/05/14
I-75 south at Exit 167 to Port Charlotte. 04/05/14
04/05/14
04/05/14
The third southbound lane across the Peace River previously dropped at Exit 164. 04/05/14
04/05/14
Widening of I-75 south from U.S. 17 to Exit 161 was completed in early 2019. 04/05/14
Two miles ahead of the Charlotte County rest area that closed in 2015. 04/01/14
I-75 south approaching Exit 161 prior to six lane expansion. 12/26/16
12/26/16
The half mile sign for Exit 161 was replaced in 2016. 04/14/16
12/26/16
Guide signs for Exit 158 formerlly referenced just Tropical Gulf Acres. 07/02/11
Widening of I-75 was completed south to Exit 143 in October 2014. 03/04/14
South at SR 78 (Exit 148) to North Ft. Myers. 03/04/14
Entering Interstate 75 from SR 78 (Exit 143) motorists once passed this ground level based guide sign for SR 80 (Palm Beach Boulevard). Signage was replaced during freeway widening. 07/05/11
Initial work for the Caloosahatchee River bridge widening project was underway 1.25 miles ahead of Exit 141 for SR 80. 07/05/11
Originally built in the mid 1970s, the twin high rise spans for Interstate 75 were widened to four lanes in each direction between 2012 and 2015 as part of a $72 million improvement project. 11/02/06
Other improvements included the construction of a sound wall separating nearby Schneiders subdivision from the freeway. 07/05/11
Scene of I-75 south at the egress point for SR 80 (Exit 141) prior to the widening project. 07/05/11
This ground level sign for the 1.25-mile approach to Luckett Road (former Lee County 810), along with other signage on the approach, were replaced by winter 2014. 07/05/11
A mileage sign once stood at the base of the Tice Street underpass listing Bonita Springs (28 miles) and Naples (40 miles). A replacement was omitted after the completion of the 2013-14 widening project. 07/05/11
Luckett Road connects I-75 with Ortiz Avenue (CR 865). 07/05/11
A ground based guide sign previously posted 1.25 miles out from SR 82 (Dr. Martin Luther King, Jr. Boulevard). 07/05/11
Completion of the Direct Connect project linking I-75 with RSW Airport coincided with sign changes for Daniels Parkway. 07/05/11
Newer signs for Daniels Parkway reference just Cape Coral. 07/05/11
Exit 131 departs I-75 south for CR 876. 07/05/11
Former mileage sign posted beyond Daniels Parkway. 12/23/23
Traveling through the Direct Connect project that added new ramps to Terminal Access Way for RSW Airport. 12/23/23