U.S. 74 West - Laurinburg to Hamlet


A half diamond interchange (Exit 182) joins U.S. 74 west with NC 79 (Gibson Road) near Sandy Bottoms.
07/28/13
Future Interstate 74 corridor sign posted ahead of the Turnpike Road (SR 1105) overpass along U.S. 74 west.
07/28/13
NC 79 travels 8.71 miles west from U.S. 15-401-501 outside Downtown Laurinburg to become S.C. 79, west of Gibson. S.C. 79 extends the route another 9.2 miles to S.C. 9 outside Bennettsville.
07/28/13
An RCUT intersection links U.S. 74 with Elmore Road. Elmore Road (SR 1321) angles southwest to NC 79 at Springfield and northeast to Fieldcrest (SR 1303) and Laurel Hill Church Roads nearby.
07/28/13
Exit 321, where U.S. 74 Business separates for Hamlet and Rockingham, marks the next segment of Future Interstate 74.
01/02/08
U.S. 74 continues 1.52 miles west through timberland from the Scotland County line to Exit 321.
12/21/08
Removed by 2013, this reassurance marker appeared west of SR 1846, a short service road along eastbound U.S. 74.
12/21/08
Photo Credits:
- AARoads: 07/28/13
- Alex Nitzman: 01/02/08
- ABRoads: 12/21/08
Connect with:
Page Updated Wednesday December 01, 2021.