I-75 North / I-640 East - Knoxville




I-75 north / I-640 east pass under Middlebrook Pike (SR 169) one mile ahead of Exit 1 with SR 62 (Western Avenue).
10/15/11
A collector distributor roadway (Exit 1) separates from I-75/640 north for SR 62 (Western Avenue) at the West Haven community of Knoxville. This exchange would be Exit 105 using the mileage of I-75.
10/15/11
SR 62 (Western Avenue) runs 3.41 miles east from the six-ramp parclo interchange at Exit 1 to West Knoxville and U.S. 441 (Broadway / Henley Street).
10/15/11
State Route 62 (Western Avenue) continues west from Knoxville to West Haven. The arterial route follows Oak Ridge Highway westward from Ridgedale toward Oak Ridge.
10/15/11
I-75 north splits with I-640 at a systems interchange (Exit 3) one mile beyond the Pleasant Ridge Road overpass. I-275, a 2.98 mile long route from I-40 and U.S. 441 at Downtown Knoxville, enters the exchange from the south.
01/16/19
Wilson Road passes over I-75/640 east ahead of their partition at Exit 3 with Interstate 275 south between Sharp Gap and Norwood.
01/16/19
Exit 3B departs I-75/640 east for Gap Road, which leads north to Wilson Road and U.S. 25W (Clinton Highway) at Tillery Road. U.S. 25W south combines with I-640 east for seven miles.
01/16/19
This reassurance marker precedes the Gap Road overpass. TDOT recorded 81,897 vehicles per day on I-75/640 between SR 62 and Gap Road in 2018.
01/16/19
I-75 turns northwest from Knoxville to Jacksboro, Williamsburg and Lexington, Kentucky while eastbound I-640 continues around Knoxville to Interstate 40 at Loveland.
01/16/19
A fourth eastbound lane opens ahead of the Gap Road overpass for I-75 north and I-275 south (Exit 3). Interstate 275 was commissioned in 1980 when I-75 was relocated onto the bypass with I-640.
01/16/19
Photo Credits:
- Carter Buchanan: 10/15/11
- Alex Nitzman, Justin Cozart: 08/23/03
- Brent Ivy: 01/16/19
Connect with:
Page Updated Sunday June 22, 2025.