Interstate 77 North - Mooresville to Statesville

Home » Guides » North Carolina » Interstate 77 North - Mooresville to Statesville
Interstate 77 U.S. 21 North


05/31/21


05/31/21


05/31/21


05/31/21


05/31/21

U.S. 21 splits with I-77 again at Exit 33.
05/31/21


05/31/21


05/31/21


05/31/21


05/31/21

Following Charlotte Highway, U.S. 21 branches eastward to NC 150 (W Plaza Drive) into the town of Mooresville.
05/31/21
Interstate 77 North


05/31/21


05/31/21


05/31/21

A SPUI joins Interstate 77 with Brawley School Road (SR 1100) at Exit 35.
05/31/21


05/31/21


05/31/21


05/31/21


05/31/21


05/31/21


05/31/21


05/31/21


05/31/21


05/31/21


05/31/21

Rest areas along I-77 in Mooresville permanently closed when a new facility opened south of Exit 59 on February 1, 2018.1
09/23/14


05/31/21

Exit 42 serves Lake Norman State Park.
05/31/21


05/31/21


05/31/21


05/31/21

I-77 enters the Statesville city limits ahead of Exit 45.
05/31/21


05/31/21


05/31/21


05/31/21

U.S. 70 (Garner Bagnal Boulevard) meets I-77 at a folded diamond interchange (Exit 49A) in south Statesville.
05/31/21

I-77 lowers to cross Third Creek adjacent to the Larkin Golf Club development.
09/23/14

U.S. 70 connects Statesville with Salisbury 25 miles to the southeast.
05/31/21


05/31/21

U.S. 70 (Garner Bagnal Boulevard) bypasses Downtown Statesville to the south, from I-77 west to I-40.
05/31/21

Salisbury Road (SR 2735) is the former route of U.S. 70 northwest to E Front Street in Downtown Statesville.
05/31/21


05/31/21


05/27/17


05/31/21

Started in 2012, a long term project improves the 1960s built exchange joining I-77 with I-40 into a partial turbine interchange.
01/17/19


05/31/21

Completed by March 14, 2017, an $89 million project replaced the loop ramp (Exit 51 B) for I-40 west with a directional ramp. Work also expanded I-40 between NC 115 and Old Mocksville Road (SR 2158) to six lanes.
05/31/21

A $260 million contract was awarded in December 2018 for widening 7.4 miles of I-40 and I-77 and building the partial turbine interchange between the two. The project is scheduled to run through the end of 2022.2
05/31/21

Interstate 40 travels across the north side of Statesville west to Hickory and Asheville.
05/31/21

East of I-77, Interstate 40 trends northward to Mocksville and Winston-Salem.
05/31/21


09/23/14


09/23/14


09/23/14

U.S. 21 (Turnersburg Highway) crosses paths with Interstate 77 north of Statesville en route to Turnersburg.
09/23/14


09/23/14

Fort Chiswell, Virginia is the location where Interstate 77 combines with I-81 south.
09/23/14

Costing $15 million, a new rest area opened between the north and south roadways of I-77, 1.5 miles south of Exit 59. Constructed between Spring 2015 and Winter 2018, the 5,000 square facility replaced the subsequent rest area at the Yadkin County line.1
09/23/14


09/23/14


09/23/14


09/23/14


09/23/14


09/23/14


09/23/14


09/23/14


09/23/14


09/23/14


09/23/14


09/23/14

 
Sources:
  1. "Iredell County to get new rest area on I-77." WBTV-TV3, January 30, 2018.
  2. "Contract Awarded for Next Phase of I-40/I-77 Interchange Improvements." North Carolina Department of Transportation (NCDOT), press release. December 3, 2018.


Photo Credits:

  • 09/23/14 by AARoads.
  • 05/27/17 by Carter Buchanan.
  • 01/17/19 by AARoads.
  • 05/31/21 by AARoads.

Connect with:
Interstate 40
U.S. 21

Page Updated 01-29-2023.

Go to Top