Interstate 95 North - St. George to Summerton

Interstate 95

Construction started on January 5, 2025 upgrades the cloverleaf interchange joining I-26/95. Work replaces the loop ramps from I-95 to I-26 with directional flyovers and accommodates both freeways for future widening. Substantial project completion is anticipated for June 9, 2027, followed by final completion on November 6, 2027.

Further north, construction replaces the bridges taking Interstate 95 across Lake Marion. Built in 1968, the spans were rated in fair but deteriorating condition (Laird, 2024). The new wider spans will accommodate two 12-foot wide travel lanes, 10-foot inside shoulder and a 12-foot outside shoulder. Additionally the bridge decks will be wide enough to support three lanes in each direction. A $175 million federal grant for the $350 million overall project was awarded to the South Carolina Department of Transportation (SCDOT) on July 17, 2024 (Laird, 2024).

i-095-north-manning-sc
i-095-sc

References:

  1. "Traffic using interchange; I-95, U.S. 301 accessible; work on connector to be done in April." The Times and Democrat (Orangeburg, SC), February 21, 2017.

Laird, S. (2024, July 17). $175M federal grant enables SC to build new I-95 bridge over Lake Marion. South Carolina Daily Gazette. https://scdailygazette.com/2024/07/17/175m-federal-grant-enables-sc-to-build-new-i-95-bridge-over-lake-marion/