Interstate 95 North - Stafford County

Home » Guides » Virginia » Interstate 95 North - Stafford County

Interstate 95 U.S. 17 North
U.S. 17 Business follows Warrenton Road southeast from I-95/U.S. 17 to Falmouth and U.S. 1 (Cambridge Street). U.S. 17 Business runs 8.71 miles south from Falmouth to New Post through the city of Fredericksburg. 07/12/24
The I-95 Express Lanes Fredericksburg Extension lengthened the reversible roadway south from ahead of Exit 143 to SR 610 (Garrisonville Road). The roadway flows northbound during weekday morning peak hours. 07/12/24
U.S. 17 continues 33 miles northwest from Interstate 95 and U.S. 17 Business to U.S. 211 and Warrenton. 07/12/24
U.S. 17 (Warrenton Road) north 3.1 miles through Berea constitutes another heavily developed commercial arterial for the Fredericksburg area. 07/12/24
Interstate 95 North
A loop ramp formerly connected I-95 north with the continuation of U.S. 17 north at Exit 133. The tolled Express Lanes begin a half mile north of Warrenton Road. 07/12/24
With separate access to the I-95 Express Lanes, the c/d roadway from U.S. 17 (Warrenton Road) returns to Interstate 95 north across Falls Run. 07/12/24
The Express Lanes commence northbound ahead of the Truslow Road (SR 652) overpass, 39 miles from Alexandria and 48 miles from D.C. 07/12/24
The next northbound exit joins the general travel lanes of Interstate 95 with Centreport Parkway (SR 8900). The diamond interchange at Exit 136 opened on December 22, 2005. 07/12/24
SR 8900 (Centreport Parkway) connects Interstate 95 with parallel U.S. 1 at a grade separated intersection north of Cranes Corner. 07/12/24
SR 8900 (Centreport Parkway) meanders west from Exit 136 toward Abel Lake before turning east again to Stafford Regional Airport (RMN) and SR 628 (Ramoth Church Road). 07/12/24
Interstate 95 crosses Potomac Creek at mile marker 137. 07/12/24
Advancing into southern reaches of the Washington metropolitan area, I-95 continues to a diverging diamond interchange with SR 630 (Courthouse Road) at Stafford. 07/12/24
The Stafford county seat lies 0.9 miles to the east along Courthouse Road (SR 630) at U.S. 1 (Jefferson Davis Highway). SR 640 branches east from a four lane extension of Hospital Center Boulevard to U.S. 1 at Stafford Hospital. 07/12/24
Courthouse Road (SR 630) constitutes a major collector northwest through newer suburban development to SR 648 (Shelton Shop Road). 07/12/24
The DDI at Exit 140 replaced a diamond interchange located slightly further to the north with SR 630. The exchange was constructed as part of $195 million project realigning Courthouse Road from July 2017 to July 31, 2020.1 12/17/20
Lengthening the all electronic toll lanes southward two miles to Aquia, the I-95 Express Lanes Southern Extension opened northbound on November 1, 2017.2 07/12/24
The final interchange within Stafford County before I-95 north crosses Quantico U.S. Marine Corps Reservation connects with U.S. 1 (Jefferson Davis Highway) and SR 610 (Garrisonville Road) between Aquia and Garrisonville. 07/12/24
The ingress point for the I-95 Express Lanes Southern Extension is located within the cloverleaf interchange (Exit 143) with U.S. 1 and SR 610 (Garrisonville Road). Construction on the reversible toll lanes got underway in July 2016.2 07/12/24
U.S. 1 converges with Interstate 95 at the suburban community of Aquia in northern Stafford County. 07/12/24
The I-95 Express Lanes Southern Extension opened to traffic southbound on October 31, 2017. The overall project was completed in December 2017.2 07/12/24
Exit 143 A directly links the northbound lanes of I-95 with adjacent U.S. 1. 07/12/24, 12/16/16
The I-95 Express Lanes extend northward to Springfield and along Interstate 395 to Arlington. 12/17/20
Garrisonville Road (SR 610) travels between U.S. 1 and Fauquier County on the southern outskirts of the Marine Corps Base Quantico. 07/12/24
The succeeding ingress point for the I-95 Express Lanes northbound is located just beyond Aquia Creek. 12/17/20
All motorists taking the I-95 Express Lanes are required to use an E-ZPass transponder. E-ZPass Flex Transponders allow carpools with three or more passengers to use the lanes for free. 07/12/24, 12/17/20
Interstate 95 passes between the Woodstream and Port Aquia town house developments ahead of Aquia Creek. 12/17/20
The 2012-14 conversion of the reversible HOV roadway into an HOT facility allowed single occupant vehicles to use the Express Lanes for a variable toll rate. The HOV requirement increased from two to three for toll free usage. 12/17/20
Widening of the HOV roadway to three lanes preceded extension of the I-95 Express Lanes southward from Alexandria to Aquia. 12/17/20, 07/12/24
The second ingress point for the tolled I-95 Express Lanes separates from the general travel lanes at mile marker 145.3. Speed limits are posted at 65 miles per hour on the managed lanes. 07/12/24
A flyover linking the I-95 Express Lanes with the local lanes ahead of Exit 148 to Marine Corps Base Quantico opened to traffic on December 8, 2023 (Transurban, n.d.). 07/12/24
Advancing northward from Aquia Creek, Interstate 95 travels through Marine Corps Base Quantico with six general travel lanes and two reversible Express lanes. 07/12/24
Telegraph Road (SR 637) crosses over I-95 three quarters of a mile south of Exit 148 to Russell Road. 07/12/24
The flyover linking the I-95 Express Lanes northbound with Exit 148. 07/12/24
The parclo interchange (Exit 148) at Russell Road represents the main exit from Interstate 95 for Marines Corps Base Quantico. 07/12/24
Northbound I-95 crosses Chopawamsic Creek into Prince William County at Exit 148 to Russell Road. Russell Road winds east from Telegraph Road to Quantico Station. 07/12/24


 
Sources:
  1. "Diverging Diamond Interchange in Stafford County Opens at Exit 140 on Saturday, Dec. 7." https://www.virginiadot.org/newsroom/fredericksburg/2019/ diverging-diamond-interchange-in- stafford-county-opens-at-exit-140-on-saturday-dec-711-21-2019.asp VDOT (Virginia Department of Transportation) News - Fredericksburg. November 21, 2019.
  2. I-95 Express Lanes Southern Extension. http://www.virginiadot.org/ projects/fredericksburg/ 95_express_lanes_southern_terminus.asp Virginia Department of Transportation, project web page. Accessed December 16, 2018.
  3. Transurban. (n.d.). FredEx | Express Lanes. https://expresslanes.com/95extension


Photo Credits:

12/16/16, 12/17/20, 07/12/24 by AARoads