Interstate 505 - South

South
Interstate 505 branches south from a wye interchange with I-5 near Dunnigan on a 33 mile course to I-80 in Vacaville.
07/11/18
07/11/18
Two sets of 230kV Pacific Gas and Electric (PG&E) transmission lines join the Path 15 PG&E 500kV line along the east side of I-505 ahead of Exit 21.
12/29/04
12/29/04
Madison is located between I-505 and Esparto along SR 16 west. Traveling east, SR 16 joins the freeway with Woodland and I-5.
07/11/18
07/11/18
The Rocky Ridge mountain chain appears along the western horizon as I-505 continues south through agricultural sections of Yolo County.
07/11/18
07/11/18
Overall, SR 128 extends 135.17 miles from Winters on a northwesterly course to SR 1 (Shoreline Highway) south of Albion.
07/11/18
07/11/18
Allendale Road meets I-505 at a diamond interchange (Exit 6) midway between Timm Road and N Meridian Road.
07/11/18
07/11/18
Midway Road represents the first interchange (Exit 3) within the limits of Vacaville. Initially a one square mile township, Vacaville was incorporated in 1892.
07/11/18
07/11/18
Vaca Valley Parkway ties into I-505 at a diamond interchange (Exit 1C) three quarters of a mile ahead.
07/11/18
07/11/18
Interstate 505 concludes 1.5 miles ahead at an interchange (Exits 1AB) with I-80 to Sacramento, Oakland, and San Francisco.
07/11/18
07/11/18
I-80 advances southwest from I-505 and Vacaville to the greater Oakland-San Francisco metropolitan area.
07/11/18
07/11/18
A single lane departs for I-80 east along a 26.2 mile course to U.S. 50 (I-305/I-80 Business) to downtown Sacramento.
07/11/18
07/11/18
Photo Credits:
- ABRoads: 07/11/18
- Andy Field: 12/29/04
Connect with:
Page Updated Sunday January 15, 2023.
