Entering Interstate 75 from SR 78 (Exit 143) motorists once passed this ground level based guide sign for SR 80 (Palm Beach Boulevard). Signage was replaced during freeway widening. 07/05/11

Initial work for the Caloosahatchee River bridge widening project was underway 1.25 miles ahead of Exit 141 for SR 80. 07/05/11

Originally built in the mid 1970s, the twin high rise spans for Interstate 75 were widened to four lanes in each direction between 2012 and 2015 as part of a $72 million improvement project. 11/02/06

Other improvements included the construction of a sound wall separating nearby Schneiders subdivision from the freeway. 07/05/11

Scene of I-75 south at the egress point for SR 80 (Exit 141) prior to the widening project. 07/05/11

This ground level sign for the 1.25-mile approach to Luckett Road (former Lee County 810), along with other signage on the approach, were replaced by winter 2014. 07/05/11

A mileage sign once stood at the base of the Tice Street underpass listing Bonita Springs (28 miles) and Naples (40 miles). A replacement was omitted after the completion of the 2013-14 widening project. 07/05/11

A ground based guide sign previously posted 1.25 miles out from SR 82 (Dr. Martin Luther King, Jr. Boulevard). 07/05/11

Completion of the Direct Connect project linking I-75 with RSW Airport coincided with sign changes for Daniels Parkway. 07/05/11