An overhead further north replaced the ground level mileage sign at the Patuxent River. 08/04/13
A distributor roadway system was constructed as part of ICC construction to offset weaving traffic between MD 198 and MD 200. 06/20/12
06/20/12
06/20/12
06/20/12
A c/d roadway was constructed along side I-95 southbound from MD 198 to Konterra Drive and MD 200. 06/20/12
Van Dusen Road, beyond this overhead, was replaced with Konterra Drive and a new interchange with I-95. 06/20/12
Interstate 95 southbound at what was the Van Dusen Road overpass. 06/20/12
Work commencing in 2008 for the ICC added an auxiliary lane south to Exit 29B. 12/26/06
12/26/06
Button copy overheads for MD 212. This sign bridge was replaced by late 2010. 07/11/05
A dump truck with the bed up struck the sign bridge at Exit 29B in 2009, damaging both panels and revealing an original button copy shield for MD 212. 07/05/10
07/11/05