




Toll NC 147 extends the Triangle Expressway north 3.11 miles to I-40 and the Durham Freeway (NC 147) through Research Triangle Park (RTP).
02/15/19

An extension of Toll NC 147 south from the directional T interchange (Exit 67) at NC 540 to Davis Drive is planned for 2027 or later.
12/15/16

Photo Credits:
12/15/16, 02/15/19 by AARoads
Connect with:
U.S. 1
U.S. 64
Highway 147 - Durham Freeway
Page Updated 07-14-2020.