This short lived series of guide signs preceded the cloverleaf interchange with I-95 and SR 400 along I-4 east. 05/24/17
Arrow-per-lane signs replaced the separate assemblies for I-95 and SR 400 in 2019. 05/24/17
05/24/17
05/24/17
The Tomoka Farms Road (CR 415) overpass along I-4 east at I-95 was rebuilt. 05/24/17
I-4 east at the former separation with SR 400 eat to I-95 south. 05/24/17
05/24/17
An end Interstate 4 shield assembly was posted along the transition ramp to northbound I-95. 09/22/14