07/02/11
A new overhead replaced this assembly for I-10 later in 2017. 06/12/17
The second distance sign for I-275 on I-75 south was replaced in kind. 07/02/11
Live Oak was carbon copied with a sign replacement of this assembly, despite US 129 and I-10 providing more direct routes to the city. 07/02/11
07/02/11
A replacement of this sign for CR 236 omitted an exit tab. 07/02/11
07/02/11
07/02/11
NW 39th Ave was added on a replacement of this overhead. 07/02/11
Replaced ground level sign for SR 26. 07/02/11
I-75 south at SR 26 (Newberry Rd) in Gainesville. 07/02/11
I-75 south at SR 24 (Archer Rd). 07/02/11
07/02/11
SR 121 meets I-75 at Exit 382 adjacent to SR 331 on Williston Road. 07/02/11
07/02/11
One half mile ahead of Exit 352 in Ocala. 07/02/11
Exit 352 departs I-75 south for SR 40 to Downtown Ocala. 07/02/11
I-75 south at Exit 350 for SR 200. 07/02/11
I-75 south at Wildwood. 01/18/04
A sign bridge with an APL for Florida's Turnpike replaced assemblies at Exit 329 by April 2019. 07/02/11
07/02/11
1/2 mile ahead of the split with Florida's Turnpike. 01/18/04
Construction through mid 2019 rebuilt the separation of I-75 and Florida's Turnpike south. 07/02/11
This ground level guide sign with a black/white Turnpike shield was replaced after 2004. 01/18/04
A c/d roadway was built from SR 44 to I-75 and Florida's Tpk along the outside lanes here. 07/02/11
07/02/11
I-75 was widened to six lanes to Exit 321 in 2015-18. 07/02/11
CR 470 east of I-75 was upgraded to SR 470 in 2015. 07/02/11
I-75 crosses Lake Panasoffkee one mile ahead of Exit 321. 07/02/11
Southbound at CR 470 and CR 475. 07/02/11
Widening of I-75 south to Bushnell was completed in 2018. 07/02/11
SR 48 was downgraded to CR 48 in 2016. 07/02/11
Exit 314 departs I-75 south for CR 48 at Bushnell. 07/02/11
A replacement of this mileage sign during the 2016-17 widening of I-75 revised the distance to I-275 from 39 to 29 miles. 09/02/13
Signage for Exit 309 previously displayed CR 476, but this was in error as the county road passes over I-75 well north of Exit 309 near Bushnell. 09/02/13
Widening of I-75 in 2016-17 included new overheads for Exit 309 showing CR 476B and 673 instead of CR 476. 09/02/13
1/2 mile ahead of the Sumter County rest area. 09/02/13
South at the Sumter County rest area. 09/02/13
One mile north of the diamond interchange with U.S. 98/SR 50. 09/02/13
I-75 south at Exit 301 prior to six-lane expansion. 09/02/13