Like the Polk County Widening, our highway guides for Interstate 4 throughout Florida are complete. Added were photos showing the new Exit 60 interchange with Florida 429 Toll (Daniel Webster Western Beltway), widening underway in Volusia County, completed widening in Polk, the new viaducts and carriageways in Tampa, and every east and westbound exit.
Work still continues on Interstate 4 at the U.S. 192 interchange in northern Osceola and with the future stack interchange at the East-West Expressway in downtown Orlando. Future projects along the freeway include a redesign of the Colonial Drive (U.S. 17-92 & Florida 50) and Maitland Boulevard (Florida 414) interchanges among others and the building of a new interchange with the Crosstown Expressway Connector in Tampa.
Cool! I clinched I-4 back in April of this year. All I remembered was a LOT of traffic in and around Orlando. It was stop-and-go around Disney World, but in downtown Orlando it was REALLY BAD. I don’t recall a whole lot of construction, but I wasn’t really looking.
As of March 2008 construction was complete as I went to Disney World with my high school’s marching band. FYI the place we stayed was off US 192 just south of I-4.