


NC 540 (Triangle Expressway) spurs east to NC 55 at Holly Springs. Construction through 2023 extends the toll road to I-40 at Garner.
02/15/19

A two lane ramp (Exit 93) connects U.S. 1 with the TriEx north to Research Triangle Park (RTP) and Durham and NC 540 east to Feltonville.
02/15/19

NC 55 travels south from Holly Springs to the town of Fuquay-Varina and north into Apex around Downtown.
12/15/16

A parclo B2 interchange joins U.S. 1 with Ten Ten Road (SR 1010) southeast from Center Street and Downtown Apex.
12/15/16



Wake Forest lies 28 miles to the northeast via U.S. 1 and the overlaps with U.S. 64, I-440 and U.S. 401.
12/15/16

U.S. 64 splits with U.S. 1 north to combine with Interstate 40 east across the south side of Raleigh.
12/15/16
Photo Credits:
12/15/16, 02/15/19 by AARoads
Connect with:
Interstate 40
Interstate 440 / Cliff Benson Beltline
Interstate 540 / Toll NC 540
U.S. 64
Page Updated 07-15-2020.