U.S. 1 North - New Hill to Cary

Home » Guides » North Carolina » U.S. 1 North - New Hill to Cary
U.S. 1 North

Confirming marker posted east of the exchange with Old US 1 at Merry Oaks.
02/15/19


02/15/19

U.S. 1 enters southwestern Wake County by Shearon Harris Reservoir.
02/15/19


02/15/19

SR 1127 (New Hill Holleman Road) meets U.S. 1 at Exit 89 south of the New Hill community.
02/15/19

New Hill lies east of B. Everett Jordan Lake.
02/15/19


02/15/19

U.S. 1 bee lines northeast from New Hill to the Triangle Expressway at Exit 93.
02/15/19

NC 540 (Triangle Expressway) spurs east to NC 55 at Holly Springs. Construction through 2023 extends the toll road to I-40 at Garner.
02/15/19

A two lane ramp (Exit 93) connects U.S. 1 with the TriEx north to Research Triangle Park (RTP) and Durham and NC 540 east to Feltonville.
02/15/19


02/15/19


12/15/16

NC 55 (E Williams Street) converges with U.S. 1 north from Holly Springs at Exit 95.
12/15/16

NC 55 travels south from Holly Springs to the town of Fuquay-Varina and north into Apex around Downtown.
12/15/16


12/15/16


12/15/16


12/15/16

A parclo B2 interchange joins U.S. 1 with Ten Ten Road (SR 1010) southeast from Center Street and Downtown Apex.
12/15/16


12/15/16


12/15/16


12/15/16


12/15/16


12/15/16
U.S. 1 North U.S. 64 East


12/15/16


12/15/16

Wake Forest lies 28 miles to the northeast via U.S. 1 and the overlaps with U.S. 64, I-440 and U.S. 401.
12/15/16


12/15/16


12/15/16


12/15/16


12/15/16


12/15/16

U.S. 64 splits with U.S. 1 north to combine with Interstate 40 east across the south side of Raleigh.
12/15/16

U.S. 1/64 meet I-40 and I-440 east at a cloverleaf interchange (Exit 1).
12/15/16

Interstate 440 (Cliff Benson Beltline) begins along side U.S. 1 north from the exchange with I-40.
12/15/16

 


Photo Credits:

12/15/16, 02/15/19 by AARoads

Connect with:
Interstate 40
Interstate 440 / Cliff Benson Beltline
Interstate 540 / Toll NC 540
U.S. 64

Page Updated 07-15-2020.

Go to Top