State Road 429 South - Apopka to Ocoee

Home » Guides » Florida » State Road 429 South - Apopka to Ocoee

Florida State Road 429 South
The entrance ramp from SR 453 expands SR 429 to four southbound lanes ahead of the parclo interchange (Exit 38) with Kelly Park Road. 02/12/21
Kelly Park Road extends west from Exit 38 to Round Lake Road and east across north Apopka to CR 435 (Mt. Plymouth Road) and Kelly Park / Rock Springs. 02/12/21
CR 437 (Plymouth Sorrento Road) intersects Kelly Park Road just east of Wekiva Parkway. The CR 437 trailblazer posted at the Exit 38 ramp end previously referenced Kelly Park Road westbound incorrectly. 02/12/21
Wekiva Parkway Sections 1B and 1A extend south from Kelly Park Road to U.S. 441 and CR 437 in Apopka. These segments opened simultaneously on July 27, 2017. 02/12/21
Progressing south Wekiva Parkway passes through portions of the Apopka city limits. 09/03/17
The Ponkan Mainline Toll collection point lies south of the Ponkan Road underpass along SR 429. 09/03/17, 02/12/21, 09/02/19
SR 429 Connector Road joins the south end of Wekiva Parkway with U.S. 441 (Orange Blossom Trail) and Orange County Road 437 (Plymouth Sorrento Road) in one mile. 02/12/21
Orange Blossom Trail (OBT) leads southeast from Exit 34 to Plymouth and Downtown Apopka. 02/12/21
One half mile north of Exit 34 at the Belgian Street overpass on SR 429 south. U.S. 441 (OBT) travels southeast from Mt. Dora and Zellwood to Hiawassee and Orlando. 02/12/21
Entering the single point urban interchange (SPUI) with SR 429 Connector Road on SR 429 (Wekiva Parkway) south. 02/12/21, 09/03/17
Florida State Road 414 East Florida State Road 429 South
Wekiva Parkway ends as SR 414 / John Land Apopka Expressway begins across U.S. 441 (OBT). 02/12/21
SR 414 east accompanies SR 429 south along the Apopka Expressway for three miles. 02/12/21
SR 429 branches south from the Apopka Expressway (SR 414) two miles from the Lust Road underpass. 02/12/21
The first in a series of Arrow-Per-Lane (APL) signs outlines the forthcoming three-wye interchange (Exit 30) with the Daniel Webster Western Beltway south. 02/12/21
Traveling south from Apopka, the Western Beltway heads to Ocoee and Winter Garden. 02/12/21
SR 414 continues east along the tolled John Land Apopka Expressway through south Apopka to Piedmont, Hiawassee and U.S. 441. 02/12/21
Southbound at the separation with SR 414 east. SR 414 extends east from U.S. 441 (OBT) along Maitland Boulevard, a varying arterial and expressway to I-4 and U.S. 17/92 in Maitland. 09/02/19
Florida State Road 429 South
County Road 437A (Ocoee Apopka Road) heads south from central Apopka to converge with SR 429 (Western Beltway) at Exit 29. 02/12/21
A flyover ramp connects SR 414 west and SR 451, the northern spur of the Western Beltway, with SR 429 south just ahead of the diamond interchange (Exit 29) with CR 437A (Ocoee-Apopka Road). 02/12/21
Back to back lane drops take place along SR 429 south at Exit 29. 02/12/21
Construction for the Apopka Expressway included realigning the Western Beltway to their exchange at Harmon Road. A portion of the original Western Beltway, including a diamond interchange with CR 437A, was demolished during construction. 02/12/21
CR 437A (Ocoee-Apopka Road) travels west from Exit 29 to the Paradise Heights community and suburban areas of north Ocoee. 02/12/21
Ocoee and Winter Garden lie opposite one another along SR 50 (W Colonial Drive) within the next seven miles. The 18 miles to Downtown Orlando references Florida's Turnpike south to SR 408 east. 02/12/21
The Western Beltway continues another 23 miles within Orange County to U.S. 192. 02/12/21
The Forest Lake Mainline Toll Plaza along SR 429 south lies beyond the McCormick Road underpass in north Ocoee. 02/12/21
SR 429 crosses over McCormick Road one mile ahead of the diamond interchange (Exit 26) with West and Clarcona-Ocoee Roads. 02/12/21
Two lanes partition at the Forest Lake Mainline Toll Plaza for both the EPass / Sunpass lanes and toll booths offering cash transactions. 02/12/21
SR 429 advances south through the Forest Lake Golf Course in Ocoee to Exit 26. 02/12/21
West Road links SR 429 with CR 437A (Ocoee-Apopka Road) at Ocoee Crown Point Parkway. CR 437A switches sides with the Western Beltway south to the Ocoee city center. 02/12/21
Construction in 2010-13 both realigned and expanded Clarcona Ocoee Road into a multi lane arterial east from SR 429 to Clarcona and Hiawassee. 02/12/21
Distance sign posted 87 miles from Tampa via SR 429 south and Interstate 4 west. 02/12/21
Confirming marker for SR 429 south posted at the Ocoee-Apopka Road underpass. 02/12/21
Turning south, the Western Beltway parallels the Winter Garden city line to a parclo interchange (Exit 24) with SR 438 (Plant / Franklin Streets). 02/12/21
Three successive off-ramps depart over the course of 1.5 miles starting with Exit 24 for SR 438 (Franklin Street) east into Ocoee. 02/12/21
Development of Park @ 429 broke ground in May 2017 on a 45.5 acre vacant site between SR 429 and Crown Point Road. The industrial park houses five warehouse / distribution buildings with 613,400 square feet of space.1 02/12/21
SR 438 (Plant Street) west to Downtown Winter Garden and the town of Oakland was turned over from state maintenance. The state road remains posted east to U.S. 441 (OBT) through Ocoee, Pine Hills and northwest Orlando. 02/12/21
SR 429 (Western Beltway) separates Ocoee and Winter Garden south to the diamond interchange (Exit 23) with SR 50 (W Colonial Drive). Visible along the east side of SR 429 here is the 652,696 square foot, Distribution 429 industrial park. Construction at the 43.9 acre site got underway in May 2018.2 02/12/21
SR 50 represents a cross-peninsula route between Weeki Wachee and Brooksville to the west and Orlando and Titusville to the east. Through Orlando, the state road follows Colonial Drive, a slow moving commercial arterial. Florida's Turnpike parallels SR 50 west to Oakland and east Clermont. 02/12/21
The Western Beltway navigates through an S-curve south from a Florida Central Railroad (FECN) underpass to Story Road. 02/12/21
Florida's Turnpike south connects the Western Beltway with SR 408 (East-West Expressway) across the city of Orlando. 02/12/21
Exit 22 departs from SR 429 south for SR 50 (W Colonial Drive) to Winter Garden, Ocoee and Pine Hills. 02/12/21


 
Sources:
  1. "Construction to start on Ocoee industrial park." Orlando Business Journal (FL), April 25, 2017.
  2. "McCraney plans large industrial park in Ocoee." West Orange Times & Observer (Winter Garden, FL), May 16, 2018.


Photo Credits:

09/03/17, 09/02/19, 02/12/21 by AARoads

Connect with:
U.S. 441
State Road 50
State Road 414 - Apopka Expressway / Maitland Boulevard
State Road 438 / Orange County 438
State Road 451
State Road 453 - Mount Dora Connector
State Road 437 / County Road 437
Orange County Road 437A

Page Updated 11-10-2022.

Go to Top